Results:
Tag: water management
Clear
  • Lake Washington annual summer refill underway

    U.S. Army Corps of Engineers officials continue the remainder of the annual refill of Lake Washington to elevation 22 ft the week of May 22.
  • USACE begins releases from Bear Creek, Cherry Creek Dams in Colorado, following storms

    The U.S. Army Corps of Engineers began releasing stored flood water on May 15 from Bear Creek and Cherry Creek Dams following storms on May 11-12.
  • Corps to begin deep drawdowns at Green Peter, Lookout Point

    Beginning in June, the Portland District, U.S. Army Corps of Engineers will begin to gradually drawdown Lookout Point and Green Peter reservoirs to historically low levels. The goal of these reservoir “drawdowns,” which are part of an injunction ordered by the U.S. District Court for the District of Oregon, is to increase juvenile spring Chinook and steelhead survival and passage through the reservoirs and past the dams.
  • USACE prepares for large-volume snowmelt at Isabella Lake

    Due to record-high snowpack over the winter, the USACE Sacramento District is preparing for above-average inflows to and outflows from USACE-managed reservoirs throughout California’s Central Valley, including Isabella Lake.
  • Corps to provide update on Willamette Valley reservoirs ahead of summer conservation season

    After a historically dry start to the refill season, water managers with the Portland District, U.S. Army Corps of Engineers (Corps) are now optimistic about refilling most Willamette Valley reservoirs after increased rainfall and snowmelt in April. To help explain the nuances of this water year, including refill and the conservation forecast, Corps staff will host a virtual public information session May 10, noon to 1 p.m., and May 11, 5-6 p.m.
  • USACE set to take full control of Isabella Dam water releases

    The U.S. Army Corps of Engineers Sacramento District will begin the process early Thursday morning
  • 23-029 Boise River flows to increase April 20

    BOISE, Idaho -- The U.S. Army Corps of Engineers and the Bureau of Reclamation will continue to increase Boise River flows through the City of Boise on April 20. These releases will help reduce the risk of flooding during periods of high snow runoff anticipated later this spring. Officials encourage the public to be aware of risks associated with increased Boise River flows. The water is deep, cold and fast. Individuals should use extreme caution near the riverbanks.
  • 23-028 High Malheur River flows anticipated this spring

    Vale, Oregon -- The U.S. Army Corps of Engineers and the Bureau of Reclamation want the public to be aware that higher than normal water levels are anticipated in the Malheur River this spring.
  • USACE reduces target flows from Lake Okeechobee

    The U.S. Army Corps of Engineers Jacksonville District will reduce releases from Lake Okeechobee to the St. Lucie and Caloosahatchee River Estuaries beginning Saturday, April 15.
  • Missouri River Spring Virtual Public Meeting - Make Up - April 20

    A virtual make up meeting has been scheduled for April 20 at 1 p.m. after two in-person meetings were canceled due to weather on April 4. The virtual meeting can be accessed at the QR code and the url in the graphic.