Regulatory Program Frequently Asked Questions

How can I obtain further information in reference to permit requirements?

Information about the regulatory program is available from any Corps district regulatory office.

What will happen if I do work without getting a permit from the Corps?

Performing unauthorized work in waters of the United States or failure to comply with the terms of a valid permit can have serious consequences. You would be in violation of federal law and could face stiff penalties, including fines and/or requirements to restore the area. 

Enforcement is an important part of the Corps regulatory program. Corps surveillance and monitoring activities are often aided by various agencies, groups, and individuals, who report suspected violations. When in doubt as to whether a planned activity needs a permit, contact the nearest district regulatory office. It could save a lot of unnecessary trouble later.

How can I design my project to eliminate the need for a Corps Permit?

If your activity is located in an area of tidal waters, the best way to avoid the need for a permit is to select a site that is above the high tide line and avoids wetlands or other water-bodies. In the vicinity of fresh water, stay above ordinary high water and avoid wetlands adjacent to the stream or lake. Also, it is possible that your activity is exempt and does not need a Corps Permit. Another possibility for minor activities is that a Nationwide or a Regional General Permit may have authorized them. So, before you build, dredge or fill, contact the Corps district regulatory office in your area for specific information about location, exemptions, and regional and nationwide general permits.

Why should I waste my time and yours by applying for a permit when you probably won't let me do the work anyway?

Nationwide, less than one percent of all requests for permits are denied. Those few applicants who have been denied permits usually have refused to change the design, timing, or location of the proposed activity. When a permit is denied, an applicant may redesign the project and submit a new application. To avoid unnecessary delays pre-application conferences, particularly for applications for major activities, are recommended. The Corps will endeavor to give you helpful information, including factors, which will be considered during the public interest review, and alternatives to consider that may prove to be useful in designing a project.

Why do I have to get a permit from the Corps? I have obtained permits from local and state governments ...

It is possible you may not have to obtain an individual permit, depending on the type or location of work. The Corps has many general permits, which authorize minor activities without the need for individual processing. Check with your Corps district regulatory office for information on general permits. When a general permit does not apply, you may still be required to obtain an individual permit.

When should I apply for a permit?

Since three to four months is normally required to process a routine application involving a public notice, you should apply as early as possible to be sure you have all required approvals before your planned beginning date. For a large or complex activity that may take longer, it is often helpful to have a "pre-application consultation" or informal meeting with the Corps during the early planning phase of your project. You may receive helpful information at this point, which could prevent delays later. When in doubt as to whether a permit may be required or what you need to do, don't hesitate to call a district regulatory office.

Who should apply for a permit?

Any person, firm, or agency (including Federal, state, and local government agencies) planning to work in navigable waters of the United States, or discharge (dump, place, deposit) dredged or fill material in waters of the United States, including wetlands, must first obtain a permit from the Corps of Engineers. Permits, licenses, variances, or similar authorization may also be required by other Federal, state and local statutes.

What is a wetland and what is its value?

Wetlands are areas that are periodically or permanently inundated by surface or ground water and support vegetation adapted for life in saturated soil. Wetlands include swamps, marshes, bogs and similar areas. As a significant natural resource, wetlands serve important functions relating to fish and wildlife. Such functions include food chain production, habitat, nesting spawning, rearing and resting sites for aquatic and land species. They also provide protection of other areas from wave action and erosion; storage areas for storm and flood waters; natural recharge areas where ground and surface water are interconnected; and natural water filtration and purification functions. 

Although individual alterations of wetlands may constitute a minor change, the cumulative effect of numerous changes often results in major damage to wetland resources. The review of applications for alteration of wetlands will include consideration of whether the proposed activity is dependent upon being located in an aquatic environment.