News Stories

Results:
Archive: 2021
Clear
  • April

    VIDEO Prado Basin Ecosystem Restoration, Chief's Report

    On April 22, Earth Day, Lt. Gen. Scott Spellmon, the 55th Chief of Engineers, signed a Chief’s Report, which recommends a multi-year, multi section plan to tackle loss and/or degradation of aquatic, riparian woodland and floodplain habitats along the Santa Ana River due to numerous issue the waterway has experienced since the 1940s.
  • Jacksonville District hosts media day

    CLEWISTON, Fla. (April 14, 2021)—The U.S. Army Corps of Engineers Jacksonville District hosted it’s first-ever media day by inviting media from across the region to learn about projects, mission, and completion dates for south Florida projects including the rehabilitation of Herbert Hoover Dike and Lake Okeechobee.
  • U.S. Army-delivered helipad projects at hospitals in Croatia to hasten emergency medical care and save lives

    The U.S. Army Corps of Engineers is delivering three modern helicopter landing zones at hospitals across Croatia to help reduce transportation times in emergency situations and ultimately save lives. The helicopter landing zone projects are funded through the United States European Command, or EUCOM, and are being delivered in close coordination with the U.S. Embassy in Zagreb.
  • Pittsburgh District hosts multiple tree-planting, trash cleanup events throughout Earth Day

    Earth Day 2021 began as a frosty morning with a layer of snow powdering logs and vehicles. Not even the wind biting at bare skin peeking out from the layers of jackets and face masks stopped volunteers from helping restore and beautify one of the U.S. Army Corps of Engineers Pittsburgh District lakes.
  • Sutton Lake Trails

    The Sutton Lake Project has many trails in the woodlands of central West Virginia.  Many of the trails are located near the Sutton Dam, and northeast in the Gerald R. Freeman campground there are additional hiking adventure trails. Before starting your hike, be sure and check out West Virginia’s native plant species in our new pollinator garden located near Sutton Dam.
  • St. Francis Basin Partnering Meeting a success

    Memphis District St. Francis Basin (SFB) Partners, Stakeholders and Project Management, members of the district's Hydrology and Hydraulics branch, and district Engineering and Construction managers traveled to the Fisher Delta Research Center in Portageville, Missouri for their annual partnering meeting on Mar. 30, 2021. The Memphis District Team meets annually with SFB partners and stakeholders to provide current basin status updates.
  • Expanding the Practice of EWN through Landscape Architecture

    VICKSBURG, Miss. – In this episode of the Engineering With Nature (EWN) Podcast, Dr. Jeff King, deputy national lead of the U.S. Army Corps of Engineers (USACE) EWN program, discusses how three landscape architects ― Auburn University’s Rob Holmes, University of Pennsylvania’s Sean Burkholder and the University of Virginia’s Brian Davis — have joined forces with EWN to explore innovative solutions to coastal resilience. The group describes their efforts to synthesize the engineering and landscape architecture disciplines and the opportunities and potential for advancing EWN practices. The EWN approach of leveraging natural processes to accomplish the desired engineering outcome while creating environmental and social benefits aligns well with the discipline of landscape architecture in which landscapes are co-designed by humans and natural processes. King and his guests discuss the power of integrating landscape architecture practices into the work Burkholder, Holmes and King are doing with colleagues at the Philadelphia District along the New Jersey coast.
  • Memphis District Hurley: Thawed out and ready to dredge

    During most off seasons, maintaining the Hurley takes a few months and a couple of crews to get everything done. This off-season was a bit different, as unexpected weather posed more obstacles than usual. Much of the south, including Memphis, Tennessee, was hit hard with frigid temperatures in mid-February this year. The last time Memphians experienced weather like this was in 1994.  From frozen pipes to no electricity, many people and structures were impacted by the icy weather, including the district’s Dredge Hurley.
  • Earth Day 2021: Restore Our Earth

    Happy Earth Day! Here at the U.S. Army Corps of Engineers, every day is Earth Day. Our efforts to protect and preserve the environment are an enduring mission. Environmental stewardship is part of our culture and is grounded in our USACE Environmental Operating Principles (EOPs) which we incorporate into all that we do, across all mission areas.
  • Employee Spotlight: Memphis District Administrative Professionals

    They are hard-working, reliable, flexible, exceptional communicators, organized, can multitask, and problem-solving, all while having a smile on their face. Their list of responsibilities is endless and can change from day to day depending on what is needed. Anyone who has an Administrative Professional or other specialist in this role knows how critical this person is. While appreciated daily, today, April 21, is the day these professionals should feel extra special and valued, as today is the National Administrative Professionals Day.

News Releases

Results:
Archive: 2021
Clear
  • Wallisville accepting Duck Blind applications

    The U.S. Army Corps of Engineers Galveston District, Wallisville Lake Project, Waterfowl Management Program is accepting seasonal duck blind drawing submissions by mail from May 1 to June 30, 2021, for the upcoming 2021/2022 waterfowl hunting season. A total of 50 seasonal duck blind construction permits will be offered along with 20 standby positions for this upcoming season.
  • Temporary closure of Chalk Ridge Falls Park at Stillhouse Hollow Lake

    U.S. Army Corps of Engineers officials at Stillhouse Hollow Lake announce the temporary closing of Chalk Ridge Falls Park, from April 30 to May 14, to perform a periodic inspection of the Dam and associated structures.
  • Albeni Falls Dam Officials Announce 2021 Recreation Season Openings

    U.S. Army Corps of Engineers’ officials announced today that the 2021 Albeni Falls Dam recreation season will begin May 8 with the opening of Riley Creek Recreation Area. Springy Point and Priest River “The Mudhole” Recreation Areas will open for the season May 15. Albeni Cove Recreation Area is closed for the 2021 season while the campground and day-use area are used to stage materials for Strong’s Island bank stabilization work. Trestle Creek Recreation Area opened April 1.
  • Avenue 146 still closed at Success Lake

    SACRAMENTO, Calif. – The U.S. Army Corps of Engineers Sacramento District is continuing construction
  • Army Corps constructs beach access with innovative flood barrier in Seaside Heights

    The U.S. Army Corps of Engineers and its contractor completed construction of a vehicular access in Seaside Heights, NJ where the beach meets the boardwalk at Grant Avenue. The access includes a removable coastal flood barrier, which can be quickly installed prior to a storm. The vehicular access and removable barrier are part of the 14-mile dune and beachfill project along the Barnegat Peninsula in Ocean County, NJ.
  • Camp Perry Historic District Landscape Inventory and Viewshed Analysis

    Abstract: The National Historic Preservation Act of 1966 (NHPA) established the National Register of Historic Places (NRHP), which requires federal agencies to address their cultural resources, defined as any prehistoric or historic district, site, building, structure, or object. NHPA section 110 requires federal agencies to inventory and evaluate their cultural resources. Section 106 requires them to determine the effect of federal undertakings on properties deemed eligible or potentially eligible for the NRHP. Camp Perry Joint Training Center (Camp Perry) is located near Port Clinton, Ohio, and serves as an Ohio Army National Guard (OHARNG) training site. It served as an induction center during federal draft periods and as a prisoner of war camp during World War II. Previous work established boundaries for an historic district and recommended the district eligible for the NRHP. This project in-ventoried and evaluated Camp Perry’s historic cultural landscape and outlined approaches and recommendations for treatment by Camp Perry cultural resources management. Based on the landscape evaluation, recommendations of a historic district boundary change were made based on the small number of contributing resources to aid future Section 106 processes and/or development of a programmatic agreement in consultation with the Ohio State Historic Preservation Office (SHPO).
  • AIS Data Case Study: Selecting Design Vessels for New Jersey Back Bays Storm Surge Barriers Study

    Abstract: The purpose of this Coastal and Hydraulics Engineering technical note (CHETN) is to describe how historic Automatic Identification System (AIS) vessel position data were used to identify a design vessel for use in a storm surge barrier design study. Specifically, this CHETN describes how the AIS data were accessed, how the universe of vessel data was refined to allow for design vessel selection, and how that selection was used in a storm surge barrier (SSB) study. This CHETN draws upon the New Jersey Back Bays Coastal Storm Risk Management Feasibility Study (USACE-NAP 2019), specifically the Appendix B.2 Engineering Appendix Civil document1. The New Jersey Back Bays Study itself builds upon the work of the North Atlantic Coast Comprehensive Study (NACCS) initiated after Hurricane Sandy in 2012 (USACE 2015a).
  • Houston Ship Channel Expansion Channel Improvement Project (ECIP) Numerical Modeling Report: Increased Channel Width Analysis

    Abstract: The Houston Ship Channel is one of the busiest deep-draft navigation channels in the United States and must be able to accommodate larger vessel dimensions over time. The U.S. Army Engineer District, Galveston (SWG) requested the U.S. Army Engineer Research and Development Center, Coastal and Hydraulics Laboratory perform hydrodynamic and sediment modeling of proposed modifications along the Houston Ship Channel. The modeling results are necessary to provide data for salinity and sediment transport analysis as well as ship simulation studies. SWG provided a project alternative that includes channel widening, deepening, and bend easing. After initial analysis, two additional channel widths in the bay portion of the Houston Ship Channel were requested for testing. The results of these additional channel widths are presented in this report. The model shows that the salinity does not vary significantly due to the channel modifications being considered for this project. Changes in salinity are 2 parts per thousand or less. The tidal prism increases by less than 2% when the project is included, and the tidal amplitudes increase by no more than 0.01 meter. The residual velocity vectors do vary in and around areas where project modifications are made.
  • Automated Construction of Expeditionary Structures (ACES): Materials and Testing

    Abstract: Complex military operations often result in U.S. forces remaining at deployed locations for long periods. In such cases, more sustainable facilities are required to better accommodate and protect forward-deployed forces. Current efforts to develop safer, more sustainable operating facilities for contingency bases involve construction activities that require a redesign of the types and characteristics of the structures constructed, that reduce the resources required to build, and that decrease the resources needed to operate and maintain the completed facilities. The Automated Construction of Expeditionary Structures (ACES) project was undertaken to develop the capability to “print” custom-designed expeditionary structures on demand, in the field, using locally available materials with the minimum number of personnel. This work investigated large-scale automated “additive construction” (i.e., 3D printing with concrete) for construction applications. This report, which documents ACES materials and testing, is one of four technical reports, each of which details a major area of the ACES research project, its research processes, and its associated results. There major areas include System Requirements, Construction, and Performance; Energy and Modeling; Materials and Testing; Architectural and Structural Analysis.
  • altWIZ: A System for Satellite Radar Altimeter Evaluation of Modeled Wave Heights

    Purpose: This Coastal and Hydraulics Engineering Technical Note (CHETN) describes the design and implementation of a wave model evaluation system, altWIZ, which uses wave height observations from operational satellite radar altimeters. The altWIZ system utilizes two recently released altimeter databases: Ribal and Young (2019) and European Space Agency Sea State Climate Change Initiative v.1.1 level 2 (Dodet et al. 2020). The system facilitates model evaluation against 1 Hz1 altimeter data or a product created by averaging altimeter data in space and time around model grid points. The system allows, for the first time, quantitative analysis of spatial model errors within the U.S. Army Corps of Engineers (USACE) Wave Information Study (WIS) 30+ year hindcast for coastal United States. The system is demonstrated on the WIS 2017 Atlantic hindcast, using a 1/2° basin scale grid and a 1/4° regional grid of the East Coast. Consistent spatial patterns of increased bias and root-mean-square-error are exposed. Seasonal strengthening and weakening of these spatial patterns are found, related to the seasonal variation of wave energy. Some model errors correspond to areas known for high currents, and thus wave-current interaction. In conjunction with the model comparison, additional functions for pairing altimeter measurements with buoy data and storm tracks have been built. Appendices give information on the code access (Appendix I), organization and files (Appendix II), example usage (Appendix III), and demonstrating options (Appendix IV).

Mississippi Valley Division

Institute for Water Resources

South Pacific Division

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,801
Follow Us