Results:
Tag: navigation
Clear
  • Chittenden Locks large chamber closes to vessel traffic Nov. 10 to Dec. 2

    The Hiram M. Chittenden Locks large chamber will close to marine traffic from 9 a.m. Tuesday, Nov. 10, to 5 p.m. Wednesday, Dec. 2. Crews will conduct maintenance and safety inspections during the large chamber pump out and closure. Foot traffic may occasionally be diverted or delayed for crane operations, but pedestrians will always be able to cross. The small lock will continue round-the-clock operations, accommodating vessels less than 115 feet in length and 26 feet in width. Current information on locking through is available at http://bit.ly/BoaterInfo. Mariners may experience delays, depending on passage demand.
  • Seasoned Engineer brings maintenance, navigation experience to Nashville District

    NASHVILLE, Tenn. (Oct. 22, 2015) – A new hire recently grabbed the helm of navigation and took charge of hydropower for the Nashville District, a move to increase oversight of navigation operations on the Cumberland and Tennessee Rivers and power generation in the Cumberland River Basin.
  • The Boatyard: History of the Fountain City Service Base

    For 100 years, the Fountain City, Wisconsin, Boatyard has played an essential role in supporting the U.S. Army Corps of Engineers’ efforts to improve navigation on the Upper Mississippi River. These efforts have included the 4 ½-foot channel project (1878-1907), the 6-foot channel project (1907-1930) and the 9-foot channel project (1930-present).
  • Origin of the Navigation System

    Along with their best suits, the delegation packed the hopes and dreams of the entire Northwest – from the farmers in the hinterland to the captains of commerce in St. Paul, Minnesota, and from the merchants on Main Street to the pillars of industry in Minneapolis.
  • Army Corps of Engineers, Port of Everett to begin Snohomish River dredging

    The U.S. Army Corps of Engineers, in partnership with local sponsor Port of Everett, is to begin maintenance dredging of the lower channel of the Snohomish River, starting at the Port of Everett Marina downstream to Everett’s Seaport in Port Gardner Bay.
  • USACE Galveston District awards $6.5 million contract for dredging of Brazos Island Harbor

    GALVESTON, Texas (Oct. 5, 2015) – The U.S. Army Corps of Engineers, Galveston District, awarded a contract in the amount of $6,521,000 to Weeks Marine Inc. for maintenance dredging of the Brazos Island Harbor (BIH) Jetty and Entrance channels in South Texas.
  • USACE Galveston District awards two contracts for dredging of GIWW

    GALVESTON, Texas (Oct. 1, 2015) – The U.S. Army Corps of Engineers, Galveston District, awarded two contracts for maintenance dredging of the Gulf Intracoastal Waterway (GIWW) in Texas.
  • Spotlight on USACE Galveston District’s Robert Thompson

    GALVESTON, Texas (Oct. 1, 2015) – Survey Party Chief Robert Thompson splits his work day between the shore and sea, planning, conducting and coordinating land and hydrographic surveys to determine the condition of major navigation channels and placement areas the U.S. Army Corps of Engineers Galveston District maintains.
  • Spotlight on USACE Galveston District’s Robert Thompson

    GALVESTON, Texas (Oct. 1, 2015) – Survey Party Chief Robert Thompson splits his work day between the shore and sea, planning, conducting and coordinating land and hydrographic surveys to determine the condition of major navigation channels and placement areas the U.S. Army Corps of Engineers Galveston District maintains.
  • USACE Galveston District awards $4.8 million maintenance dredging contract for Houston Ship Channel

    GALVESTON, Texas (Sept. 30, 2015) – The U.S. Army Corps of Engineers, Galveston District, awarded a contract in the amount of $4,848,500 to Weeks Marine Inc. for maintenance dredging of the Houston Ship Channel from Exxon to Carpenters Bayou in Harris County, Texas.