Congratulations to the Farrenburg Levee Phase 5 Project Delivery Team (PDT) for advancing their project to the important Contract Award milestone. The team awarded the contract to VuCon, LLC. on August 30. Work the contractor will perform consists of replacing two culverts, which have reached their life expectancy, that cross under the Farrenbeurg Levee, closing a gap in the levee and raising sections of the levee to the authorized grade. Drainage infrastructure like this is a vital part of the overall levee protection system.