AHSAHKA, Idaho – Continued rising temperatures forecasted for the coming week https://www.weather.gov have prompted changes in flow operations at the U.S. Army Corps of Engineers’ Dworshak Dam and Reservoir near Orofino, Idaho. Water previously discharging at 9,500 cubic feet per second (cfs) from Dworshak Dam began increasing this afternoon toward target flows of 12,500 cfs, according to U.S. Army Corps of Engineers (Corps) water-management officials. Downstream of the dam, water elevation will likely result in Clearwater River surface elevation increasing by about 9 inches at the at USGS gage located at Peck, Idaho.