News Stories

Results:
Tag: Missouri River
Clear
    • No Items.

News Releases

Results:
Tag: Missouri River
Clear
  • Gavins Point releases to remain steady through August

    Below-normal precipitation in Montana and Wyoming during July resulted in slightly below-average July runoff in the upper Basin. The 2020 calendar year upper basin runoff forecast, updated on August 3, is 30.9 million acre-feet (MAF), 120% of average. Average annual runoff for the upper basin is 25.8 MAF.
  • Corps awards contract to complete levee repairs on multiple levee systems in, Sheridan County, Wyoming

    OMAHA, Neb. — The U.S. Army Corps of Engineers, Omaha District awarded a $3.55M construction contract to Relyant Global LLC of Maryville, Tennessee on July 24, for the rehabilitation of Little Goose Creek Left Bank,Big Goose Creek Right Bank and Goose Creek Right Bank Levee Systems damaged by the spring 2019 flooding. The duration of the contract is 150 days after the notice to proceed.
  • Releases from Fort Peck Dam to decline during maintenance work

    Releases from Fort Peck Dam will be reduced from 11,000 cubic feet per second to 8,500 cfs on July 28 and then increase slightly to 9,000 cfs on July 29. A Power Plant maintenance project originally scheduled for June was rescheduled for late July. The project will require outages on Units 1, 2, and 3 to support testing on Unit 2.
  • ​Releases from Gavins Point Dam to decrease

    “The upper basin runoff forecast has been reduced by about 1 MAF due to the recent dry conditions as well as the National Weather Service’s climate outlook, which is indicating that the remainder of the summer will be warmer and drier than normal. However, the 2020 calendar year runoff forecast remains above average, mostly due to the very wet soil conditions during the early months of the year. Most of the mountain snowmelt runoff has entered the reservoir system. Remaining summer runoff will depend on rainfall events,” said John Remus, chief of the U.S. Army Corps of Engineers’ Missouri River Basin Water Management Division. “As a result of the reduced runoff forecast, we will reduce Gavins Point Dam releases to 30,000 cfs on July 7,” Remus added.
  • Missouri River water management public meeting presentations available online

    The U.S. Army Corps of Engineers’ Missouri River Water Management Division has released four videos of presentations that would normally be given at public meetings held throughout the Missouri River Basin. In-person public meetings on Missouri River Mainstem Reservoir System operations originally scheduled for April were canceled to further reduce potential exposure to COVID-19. Instead, the agency will host virtual question and answer sessions in late April. A web page with the videos, a form for submitting questions, and call in dates and times is located here: https://go.usa.gov/xvBpc.
  • Forecast runoff for upper Missouri River basin lower after warm spring

    Gavins Point releases are forecast to remain near 35,000 cubic feet per second through the month of April. The upper Missouri River basin March runoff fell in line with the March 1 forecast. Runoff above Sioux City, Iowa was 5.5 million acre feet, which is almost two times average. The above average runoff was primarily due to plains snow melting over heavily saturated soils. “The warmer-than-normal temperatures melted most of the plains snow in the eastern and central Dakotas. Along with the steady, but near average, rate of snow accumulation in the mountains, the projected upper Missouri River basin runoff for 2020 has been slightly reduced,” said John Remus, chief of the U.S. Army Corps of Engineers’ (Corps) Missouri River Basin Water Management Division.
  • Kansas City District continues to prioritize levee rehabilitation

    The Kansas City District continues to prioritize levee rehabilitation to repair damages incurred during 2019 historic flooding throughout the region. We are also committed to providing on-site quality assurance to awarded construction contracts all while practicing social distancing as long as necessary.
  • Reduced releases from Gavins Point expected Friday

    Releases from Gavins Point Dam will be incrementally reduced to 20,000 cubic feet per second beginning Thursday. Releases should reach 20,000 cubic feet per second by Friday morning and will be held there through the weekend.

Mississippi Valley Division

Institute for Water Resources

South Pacific Division

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,743
Follow Us