Results:
Tag: National Environmental Policy Act
Clear
  • NR 17-001: Corps of Engineers initiates scoping for Lake Cumberland water reallocation

    NASHVILLE, Tenn. (Jan. 30, 2017) — The U.S. Army Corps of Engineers Nashville District announces it is initiating scoping under the National Environmental Policy Act (NEPA) to evaluate alternatives for a water reallocation study for Lake Cumberland in south central Kentucky.
  • NR 14-032: Public input sought for draft Mill Creek Feasibility Study

    NASHVILLE, Tenn. (Oct. 30, 2014) – U.S. Army Corps of Engineers Nashville District and Metro Nashville officials are seeking public input on the draft report and environmental assessment for the Mill Creek Feasibility Study in accordance with the National Environmental Policy Act.
  • NR 14-022: Corps seeks public comment for flood risk management study

    NASHVILLE, Tenn. (July 31, 2014) – The U.S. Army Corps of Engineers Nashville District is preparing an environmental assessment in accordance with the National Environmental Policy Act, and is seeking public comment for a flood risk management study for the Cumberland River, Browns Creek, Richland Creek and Whites Creek.
  • Corps to discuss changes to Folsom Dam facilities at public meetings

    The U.S. Army Corps of Engineers Sacramento District will host public scoping meetings Feb. 19 and Feb. 24 to discuss and solicit comments for the Folsom Dam Raise Project.
  • Truckee Meadows final reports available for public review

    The U.S. Army Corps of Engineers Sacramento District is scheduled to begin a 30-day public review period Jan. 17, following the release of its final general reevaluation report and environmental impact statement for the Truckee Meadows Flood Control Project.
  • Final Berryessa Creek report available for public review

    The U.S. Army Corps of Engineers Sacramento District today released its recommended plan to reduce flood risk from Berryessa Creek. The plan would build new flood walls and box culverts and widen the channel along a 2.2-mile stretch of the creek.
  • Search for sand under way for Miami-Dade beaches

    Florida’s coastline is one of the largest in the nation, and its beaches are plentiful. The average person would think that sand is an endless resource and would never run out. However, for Miami-Dade County, sand that is dependable, economical and environmentally practicable is nearly depleted.
  • NR 13-021: Corps of Engineers initiates scoping under National Environmental Policy Act

    NASHVILLE, Tenn. (June 14, 2013) — The U.S. Army Corps of Engineers Nashville District announces it is initiating scoping under the National Environmental Policy Act (NEPA) to evaluate measures and alternatives for a flood damage reduction study for the Swannanoa River Watershed near Asheville, N.C.
  • Public comment period opens for Berryessa Ceek draft environmental document

    The Berryessa Creek draft integrated general re-evaluation report and environmental impact statement was released March 22, beginning a 45-day public review period for a proposed project along a 2.2-mile stretch of Berryessa Creek in Milpitas, Calif.
  • Spotlight on USACE Galveston District’s Mark Garza

    Spending time outdoors and learning about nature has always been a hobby for Mark Garza, a biologist in the U.S. Army Corps of Engineers Galveston District’s Environmental Section.