Results:
Tag: Turbine
Clear
  • Turbine lifted to rehabilitate hydropower unit at Center Hill Dam

    LANCASTER, Tenn. (Oct. 7, 2015) – Work crews lifted a turbine out of hydropower unit two at Center Hill Dam today, one of the final pieces of the disassembly process. It is the first time the 82-ton steel wheel has seen the light of day since its installation in 1950, a rare sight that makes it possible to inspect, rebuild embedded parts, and then reassemble the unit with new components.
  • Water managers test water quality during Hydropower operation

    HERMITAGE, Tenn., -- Water quality experts from the U.S. Army Corps of Engineers checked water quality conditions in spillway and hydropower release from J. Percy Priest Dam Nov. 10, 2014.
  • Hydropower model tests generate positive results for Center Hill rehab project

    YORK, Pa. (Oct. 10, 2014) – Corps experts witnessed a series of tests this week on a “small-scale” turbine model in a laboratory at Voith Hydro Inc. The tests were completely successful and the positive results will keep the Center Hill Hydropower Rehabilitation Project schedule on track.