• Public scoping meeting to be held for navigation study at Kaskaskia Regional Port District Terminal 2

    The U.S. Army Corps of Engineers, St. Louis District, in coordination with the non-federal sponsor, Kaskaskia Regional Port District, is hosting an in-person public meeting June 22 to discuss a navigation study for Kaskaskia Regional Port District Terminal 2, near Baldwin, Ill., from 6 – 8 p.m. at Southwestern Illinois College in Red bud, Ill.
  • Temporary Closure: Florida Avenue

    New Orleans – Work related to the Southeast Louisiana Urban Flood Control Project (SELA).
  • USACE Vicksburg District to offer daily, annual day passes online for Mississippi lakes

    VICKSBURG, Miss. -- The U.S. Army Corps of Engineers (USACE) Vicksburg District announces that Arkabutla, Sardis, Enid and Grenada Lake visitors can purchase daily and annual day use passes online.
  • Corps of Engineers invites public to meeting to discuss river sand management plan in Kellogg, Minnesota

    The U.S. Army Corps of Engineers, St. Paul District, is hosting a public meeting in Kellogg, Minnesota, June 21 to provide an update on its plan to manage river sand.
  • Chicago District’s Zahraa Al Khafaji selected for ERDC University

    Researchers from 10 U.S. Army Corps of Engineer Districts have been selected for the 2023 session of the Engineer Research and Development Center University (ERDC-U). Project Engineer Zahraa Al Khafaji of the Chicago District has been chosen as a participant for this detail program, now in its eighth year.
  • Corps tests spillway gates at Russell Dam, Thurmond Dam June 13-14

    SAVANNAH, GA – U.S Army Corps of Engineers, Savannah District, dam safety officials are testing the spillway gates at two hydropower dams on the Savannah River this week, and the releases will have minimal effect on reservoir levels.
  • Pittsburgh District Awards Contract for Fish Reefs on Monongahela River

    The U.S. Army Corps of Engineers Pittsburgh District announces the contract award for more than $2.4 million to build 73 stone fish reefs on the Monongahela River. The fish reefs construction is a part of the Lower Monongahela River project, which includes the construction of the larger lock chamber at Charleroi Locks and Dam, and the removal of Lock and Dam 3 at Elizabeth, Pennsylvania. Corps of Engineers contractors have completed Pool 3 channel dredging, and the gated dam at Braddock Locks and Dam.
  • Ridgeview Elementary Ribbon Cutting

    The Ridgeview Elementary Ribbon Cutting Ceremony took place on June 9 in Clintwood, VA at the new Ridgeview Elementary School. This event celebrated the completion of a Section 202 project that provided flood protection for Dickenson County Schools.
  • Safety at the Tip of the Spear – USACE Transatlantic Division highlights Safety program across the CENTCOM AOR

    The Transatlantic Division serves as the U.S. Army Corps of Engineers’ tip of the spear in one of the most dynamic construction environments in the world. Ensuring that building strong is synonymous with building safely, the Transatlantic Division’s Safety Office maintains an unwavering dedication to the well-being of the service members and civilians who execute the nearly $5 billion dollar program in support of U.S. Central Command, U.S. Special Forces Command and other global partners across the Middle East and Central Asia. The CENTCOM AOR presents unique and varied safety challenges, from diverse environments like deserts, seaports, and urban areas, to wide ranging cultural considerations and diversity of languages, as well as security considerations surrounding ongoing military operations. The Transatlantic Division and its Districts overcomes all of this and continues to set the standard for Safety programs in the region.
  • Dredging in Grand Haven targeting mid-July completion

    Detroit -- The U.S. Army Corps of Engineers, Detroit District (USACE) is currently utilizing 24-hour dredging in Grand Haven, Michigan during favorable weather to remove shoaling blocking Grand Haven Harbor from commercial traffic. The project is expected to be completed in mid-July. Severe weather and minimal ice cover during the winter led to increased shoaling in several harbors on Lake Michigan this year, blocking large commercial vessel traffic. Grand River commercial docks are struggling to receive shipments due to the unexpected shoaling. The King Co., Inc. of Holland, Michigan is on-site and contracted to clear 141,000 cubic yards of sand from the federal channel at Grand Haven, just beyond the pierheads. The material will be placed 7,000 to 10,000 feet north of the north pier onto the beach and into the nearshore area between the Ordinary High-Water Mark (OHWM) and the most-landward 12 feet depth contour in the lake. The placement area borders the Ottawa County North Beach Park and several properties along North Shore Drive. The contract, awarded Feb. 28, required the work to begin in Holland and Grand Haven harbors when the weather allowed in the spring using hydraulic dredging for speed and cost. Unusually windy and wavy conditions during March and April delayed dredging work in Holland.