VICKSBURG, Miss. – The U.S. Army Corps of Engineers (USACE) Vicksburg District will release higher volumes of water from its four flood control reservoirs in the Yazoo Basin – Grenada, Enid, Sardis and Arkabutla – to regain storage capacity ahead of winter and spring rains.
The Yazoo Basin reservoirs are being operated per the guidance of the district’s water control manual, which allows for increased releases and higher stages at control points downstream from November through March. The reservoirs are above their average pool stage for this time of year but are currently being drawn down to their respective winter pools, which is standard operating procedure for this time of year.