News Stories

Results:
Tag: water quality
Clear
  • October

    Floating barge with air curtain burner incinerates Lake Cumberland debris

    SOMERSET, Ky. (Oct. 22, 2020) – A new floating barge equipped with an air curtain burner began incinerating debris on Lake Cumberland this week, a move that will increase the efficiency of the U.S. Army Corps of Engineers Nashville District team charged with debris removal operations onboard the PRIDE of the Cumberland.
  • August

    Omaha District plays important role in water quality management

    Whether it is fishing, boating, swimming, or other types of water recreation the benefits of the Omaha District’s water quality management program affect outdoor enthusiasts in positive ways – these benefits even extend to water coming from the faucet.

News Releases

Results:
Tag: water quality
Clear
  • Gavins Point Dam releases reduced to winter release rate

    The U.S. Army Corps of Engineers began reducing the Gavins Point releases to the winter release rate on Nov. 24, marking the end of flow support for the 2020 Missouri River navigation season. “Releases from Gavins Point Dam were reduced from 34,000 cubic feet per second to 17,000 cfs,” said John Remus, Chief of the Missouri River Water Management Division. “Releases from Gavins Point will be adjusted this winter as needed to lessen the impacts of river ice formation on water intakes in the lower river.” Based on the Sept. 1 System storage, Gavins Point Dam winter releases will be at least 17,000 cfs.
  • Gavins Point Dam releases to be reduced to winter release rate in late November

    In two virtual public meetings held Nov. 2, U.S. Army Corps of Engineers’ Missouri River Water Management Division presented current hydrologic conditions and planned operation of the Missouri River mainstem reservoir system for the remainder of 2020. Public meetings are held each fall and spring to update the region on current conditions and planned operations. The Nov. 2 meetings included draft plans for operating the system during 2021.
  • Missouri River Water Management virtual public meetings set for Nov. 2

    The Missouri River Water Management Division invites the public to participate in one of two virtual public meetings scheduled for Nov. 2. The meetings will take place at 1:30 p.m. and 6 p.m. central time. Details for connecting to each webinar is posted to our website.
  • NR 20-26: Nashville District recognizes ‘Clean Marina’ recertifications

    NASHVILLE, Tenn. (Oct. 27, 2020) – The U.S. Army Corps of Engineers Nashville District recently completed two “Clean Marina” recertifications and recognized both for meeting established standards for clean water and environmental stewardship in the Cumberland River Basin.
  • Corps updates stakeholders on Missouri River Mainstem System operations

    The US Army Corps of Engineers Missouri River Water Management Division hosted an update call on Thursday, Oct. 22, for Congressional representatives, Tribal, and state and local government officials, to include emergency managers, local levee sponsors and the media to discuss current conditions, and the projected operation of the mainstem reservoir system as part of the Draft Annual Operating Plan which was released in mid-September for public comment.
  • The Demonstration and Validation of a Linked Watershed-Riverine Modeling System for DoD Installations – Patuxent Watershed, Maryland

    Abstract: This work evaluated a linked watershed and riverine modeling system for the Patuxent River Watershed, Maryland against observed field data and model output from a watershed model. The performance objectives were computed for streamflow, sediment, total phosphorus, orthophosphorus, total nitrogen, ammonium, and nitrate using daily and monthly average model predictions and measured data. Hydrological Simulation Program – Fortran (HSPF) was used to compute runoff, sediment, and nutrient loadings, whereas the Hydrologic Engineer Center – River Analysis Sys-tem (HEC-RAS) was used to evaluate in-stream flow, channel sedimentation, and the fate/transport of nutrients. Model results were successful for calibration, validation, and management scenario analysis. Contaminants were not simulated for this watershed due to a lack of observed data to compare against. The study identified two implementation issues. First, while the Patuxent River did not experience dry bed conditions, where a stream may be intermittent, one can incorporate a very narrow slot at the low point in the cross-section to numerically keep the channel wet during very low flows. Second, to set up the linked model, there needs to be more observed water quality data to better constrain the HSPF output being used as boundary conditions to the HEC-RAS model.
  • Below average runoff continues in the upper Missouri River basin

    September precipitation was well-below normal in the Missouri River Basin.  As a result, September runoff in the upper Missouri River Basin above Sioux City, Iowa was 69% of average.  Since January 1, precipitation in the upper Basin is well-below normal.  The National Weather Service’s Climate Prediction Center (CPC) is forecasting that below-normal precipitation will continue in October.  The 2020 calendar year runoff forecast for the upper Basin, updated on October 1, is 30.2 million acre-feet (MAF), 117% of average. Average annual runoff for the upper Basin is 25.8 MAF.
  • NR 20-024: Cheatham Lake Right Bank Recreation Area reopens

    NASHVILLE, Tenn. (Sept. 11, 2020) – The U.S. Army Corps of Engineers Nashville District announces that the Right Bank Recreation Area Beach at Cheatham Lake in Ashland City, Tennessee, is reopened as water conditions have returned to acceptable levels.
  • August inflows much below average in northern Missouri River Basin

    August precipitation was well-below normal in the Missouri River Basin, particularly in the western and far northern portions, which received less than 25% of normal precipitation. The lack of precipitation and dry soil conditions resulted in 74% of average August runoff in the Missouri River Basin above Sioux City, Iowa (upper Basin). The 2020 calendar year forecast for the upper Basin, updated on September 1, is 30.6 million acre-feet (MAF), 119% of average. Average annual runoff for the upper Basin is 25.8 MAF. Runoff in the upper Basin during the remainder of 2020 is forecast to be below average.
  • Low-level release at Zorinsky Lake set for May 1

    OMAHA, Neb. — The U.S. Army Corps of Engineers, Omaha District, will begin a small low-level release at Zorinsky Lake in Omaha on Friday to improve the water quality of the lake.

Institute for Water Resources

Pacific Ocean Division

District welcomes new tribal liaison
Nov. 14, 2023 UPDATED

South Pacific Division

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,117
Follow Us