Results:
Tag: Lake Okeechobee
Clear
  • Lock steps: Dewatering is the first step before lock repairs can begin

    Did you ever wonder why it takes so long to repair a lock? Check out the dewatering process for the Ortona Lock and Dam maintenance repairs through a series of photos of the event in 2018. It's a LOT more involved than just closing the lock and doing repairs!
  • Corps announces public comment and webinar on planned deviation from Lake O Regulation Schedule to reduce risk from Harmful Algal Blooms

    The U.S. Army Corps of Engineers Jacksonville District, announces public comment on the Draft Revised Supplemental Environmental Assessment (EA) and Proposed Finding of No Significant Impact (FONSI) for the planned deviation from the water control plan for Lake Okeechobee and the Everglades Agricultural Area, also known as the Lake Okeechobee Regulation Schedule (LORS 2008) in order to reduce risk from Harmful Algal Blooms. A webinar to provide information regarding the proposed planned deviation is planned for 1 p.m. on July 21. Public comments are due July 30.
  • Col. Kelly on Lake Okeechobee: balancing project purposes

    One of the challenges we face at the Jacksonville District of the U.S. Army Corps of Engineers is balancing all of the purposes of managing Lake Okeechobee given to us by Congress – flood control, water supply, navigation, recreation, and preservation of fish and wildlife resources. As we enter rainy season, we will keep focusing on balancing the purposes of lake water management and setting favorable conditions.
  • LOSOM PDT Meeting Scheduled for June 25; Pre-registration required

    The U.S. Army Corps of Engineers, Jacksonville District, announces the next Project Delivery Team (PDT) meeting for the Lake Okeechobee System Operating Manual (LOSOM), to be held June 25 from 1 p.m. to 4:30 p.m. Due to continuing COVID-19 restrictions on public meetings, this meeting will be held online only. NOTE: Pre-registration required.
  • Lake Okeechobee Update for 2020 Rainy Season

    After a drier than normal dry season, Lake Okeechobee operations transition to rainy season without plans for imminent large releases to estuaries.
  • Forecasted rain may require C-43, C-44 flows

    The U.S. Army Corps of Engineers Jacksonville District will maintain the current release schedule from Lake Okeechobee, but heavy rain forecasted for the Lake Okeechobee waterway May 10 may require flows from the C-43 and C-44 canals to control water levels for flood control.
  • Corps awards final cutoff wall contract for HHD rehabilitation

    The U.S. Army Corps of Engineers, Jacksonville District, awarded the final contract for the cutoff wall required as part of the ongoing rehabilitation of the Herbert Hoover Dike (HHD), the earthen structure surrounding Lake Okeechobee.
  • Corps increases flows to Caloosahatchee

    The U.S. Army Corps of Engineers Jacksonville District will increase flows from the W.P. Franklin Lock and Dam (S-79) to the Caloosahatchee estuary at a 7-day average rate of 650 cubic feet per second (cfs). Flows to the St. Lucie estuary remain at zero cfs as measured at the St. Lucie Lock and Dam (S-80). Releases will be made in a pulse pattern beginning on Saturday.
  • Corps continues flows from Lake O, supports firefighting in Everglades National Park

    The U.S. Army Corps of Engineers Jacksonville District will continue flows from the W.P. Franklin Lock and Dam (S-79) to the Caloosahatchee estuary at a 7-day average rate of 457 cubic feet per second (cfs). Flows to the St. Lucie estuary remain at zero cfs as measured at the St. Lucie Lock and Dam (S-80). Releases are made in a pulse pattern which begin on Saturday. In addition, our partners at the South Florida Water Management District have coordinated with the Corps as they mobilize pumps and modify water management operations to help control a wildfire in Everglades National Park.
  • Corps announces April 30 LOSOM Project Delivery Team Meeting via Web

    The U.S. Army Corps of Engineers, Jacksonville District, announces the next Project Delivery Team (PDT) meeting for the Lake Okeechobee System Operating Manual (LOSOM), to be held from 1:00 p.m. to 4:30 p.m. on Thursday, April 30, as an online Web Meeting (revised meeting date).