Results:
Tag: Center Hill
Clear
  • Construction begins with ‘first bite’ on foundation barrier wall at Center Hill Dam

    LANCASTER, Tenn. (July 11, 2012) – The “first bite” of a $106 million drilling project to stabilize the earthen portion of the Center Hill Dam with a barrier wall was taken today by the U.S. Army Corps of Engineers Nashville District and its contractor, Bauer Foundation Corporation, as the auger of a giant drill rig turned up the first dirt to the cheers of spectators.
  • NR 12-023: Corps offers tours of Center Hill Lake Power Plant

    LANCASTER, Tenn. (June 28, 2012) – The U.S. Army Corps of Engineers Nashville District is offering the public free guided tours of the Center Hill Power Plant. These are the first tours of the power plant since the Corps restricted visitation after Sept. 11, 2001.
  • NR 12-019: State highway over Center Hill Dam restricted to one lane starting July 9

    NASHVILLE, Tenn. (June 22, 2012) – The U.S. Army Corps of Engineers Nashville District announces today Highway 96/141 over Center Hill Dam is being restricted to one lane starting July 9, 2012. The restriction is necessary to enlarge work space on the dam to support the next construction phase of the Center Hill Dam Foundation Remediation Project, installation of the foundation barrier wall. During the two-year duration of the lane restriction, an automated traffic control system will safely manage vehicles across the dam. The maximum wait time is five minutes.
  • Black visits Center Hill Dam Foundation Remediation Project

    LANCASTER, Tenn. (May 3, 2012) – U.S. Rep. Diane Black visited Center Hill Dam today to see firsthand the ongoing foundation remediation project and to receive updates from U.S. Army Corps of Engineers Nashville District personnel overseeing the work.
  • Soldiers take aim at recovery in Center Hill Lake wild turkey hunt

    LANCASTER, Tenn. (April 13, 2012) – A wild turkey hunt at Center Hill Lake today gave soldiers rehabilitating from war wounds the opportunity to put aside the stresses associated with the every-day grind of physical and mental therapy while recovering at Fort Campbell, Ky.
  • Exploratory drilling brings out benefits of partnership between districts

    SILVER POINT, Tenn. (March 14, 2012) – A drill rig crew from the U.S. Army Corps of Engineers Baltimore District extracted core samples here today that are being closely examined by Nashville District geologists at Center Hill Lake near what is known as the Saddle Dam. However, the exploratory drilling is revealing more than just the condition of rock formations; it’s also bringing out the benefits of the two districts partnering together to explore the movement of water seepage through the karst geology in the area.
  • Division commander leaves Music City in tune with Nashville District’s ‘people’

    NASHVILLE, Tenn. (Jan. 13, 2012) – The U.S. Army Corps of Engineers Great Lakes & Ohio River Division commander visited Music City for the first time this week, and then left more in tune with Nashville District’s “people.”
  • Natural resources chief garners prestigious award

    NASHVILLE, Tenn. (July 12, 2011) – The chief of engineers recently announced that a Nashville District employee has garnered a prestigious award.
  • Center Hill Lake highlighting National Safe Boating Week

    NASHVILLE, Tenn. (May 12, 2011) – Memorial Day and boating season is fast approaching. With the warm weather, boaters are anxious about firing up the grill, setting up a tent with the family and getting out on the lake. Before launching a boat for the first time this season, take the time to check for all the required safety equipment, especially life jackets, and make sure all equipment is still in good condition.