Results:
Tag: environmental impact statement
Clear
  • Regulatory Division is meeting environmental, economic needs

    Protecting the nation’s aquatic resources while simultaneously meeting its economic needs requires dedication and an ability to balance often competing needs. Through the execution of the Department of the Army’s responsibility, authorized under the River and Harbors Act of 1899 and the Clean Water Act of 1972, the U.S. Army Corps of Engineers’ regulatory program reviews multitudes of proposed projects annually, and either issues or denies permits based on these and other applicable laws.
  • Final Berryessa Creek report available for public review

    The U.S. Army Corps of Engineers Sacramento District today released its recommended plan to reduce flood risk from Berryessa Creek. The plan would build new flood walls and box culverts and widen the channel along a 2.2-mile stretch of the creek.
  • Corps, public talk about Whittier Narrows Dam modifications

    The U.S. Army Corps of Engineers Los Angeles District held a public meeting in Pico Rivera, Calif., Sept. 11 to describe potential structural modifications to Whittier Narrows Dam and to seek comments from the public on issues and concerns they wish to have considered during the preparation of its supporting Environmental Impact Statement.
  • Army Corps to hold environmental impact scoping meeting on potential Whittier Narrows Dam modifications

    The U.S. Army Corps of Engineers Los Angeles District will hold a public meeting for the Whittier Narrows Dam Safety Modification Study and Environmental Impact Statement on Wednesday, Sept. 11, from 6:30 - 8:30 p.m., at the Pico Rivera Golf Course Clubhouse, 3260 Fairway Dr., Pico Rivera, 90660.
  • Sutter Basin Pilot Feasibility Study draft document now available for public review

    The U.S. Army Corps of Engineers Sacramento District released the draft feasibility report and environmental impact report/supplemental environmental impact statement for the Sutter Basin Pilot Feasibility Study for public review on June 14, officially opening the 45-day public comment period.
  • Truckee Meadows flood study draft documents now available for public review

    The U.S. Army Corps of Engineers Sacramento District released the draft general re-evaluation report and draft environmental impact statement for the Truckee Meadows flood control project for public review May 24, officially opening the 45-day public comment period.
  • Corps to host public meeting on the Lake Worth Inlet Feasibility Study Draft Environmental Impact Statement

    The U.S. Army Corps of Engineers will host a public meeting on the Lake Worth Inlet Feasibility Study Draft Environmental Impact Statement (DEIS) on Thursday, May 9th at the Port of Palm Beach, Executive Boardroom, One East 11th St., Suite 600, Riviera Beach, Fla. 33404.
  • Public comment period opens for Berryessa Ceek draft environmental document

    The Berryessa Creek draft integrated general re-evaluation report and environmental impact statement was released March 22, beginning a 45-day public review period for a proposed project along a 2.2-mile stretch of Berryessa Creek in Milpitas, Calif.
  • Corps identifies selected Isabella Lake Dam modernization plan

    It was also in March of 1953 that the new Isabella Lake main and auxiliary dams were completed after five years of construction, and began serving Kern County and the surrounding cities with flood risk management, irrigation and hydroelectric use. Nearly 60 years later, they continue to serve those purposes, having helped prevent flooding in downstream communities at least 18 times. But today, Isabella Lake’s dams need an upgrade. A Corps-wide survey of its dams in 2005 put Isabella Lake Dam near the top of its list of highest at-risk dams. The Corps identified significant hydrologic, seismic and seepage issues.
  • Corps releases final environmental impact statement on the Isabella Lake Dam Safety Modification Project

    The U.S. Army Corps of Engineers Sacramento District has released the final environmental impact statement (EIS) for the Isabella Lake Dam Safety Modification Project for review and comment.