Results:
Tag: Deliver the Program
Clear
  • Missouri River Basin runoff forecast improves but remains below average; Fort Peck Flow Test underway

    As warmer weather moves into the Missouri River Basin, spring precipitation brought some much-needed moisture throughout the basin. For the month of April, runoff was 2.1 million acre-feet, 71% of average, for the basin above Sioux City, Iowa. The annual runoff forecast for the upper Missouri River Basin above Sioux City is 19.2 MAF, 75% of average, and 1.7 MAF higher than last month’s forecast.
  • USACE Galveston District awards second Corpus Christi Ship Channel dredging contract

    GALVESTON, Texas – Yesterday the Galveston District, U.S. Army Corps of Engineers awarded a second multi-million dollar contract for the Corpus Christi Ship Channel Improvement Project. Callan Marine, LTD, of Galveston, Texas, will receive $97.9 million, including the base contract and seven options, to dredge Lower Bay Reach as part of Corps efforts to deepen and widen the Corpus Christi Ship Channel. Five more options are contained in the contract and could be activated at a later date.