• U.S. Army Corps of Engineers awards Rep. Napolitano Gold de Fleury Medal

    The 55th Chief of Engineers and the Commanding General of the U.S. Army Corps of Engineers Lt. Gen. Scott A. Spellmon notified U.S. Rep. Grace Napolitano of her selection to receive the Gold Order of the de Fleury award Dec. 7, 2020..
  • Corps of Engineers seeks public comments on its Upper St. Anthony Falls Lock and Dam Disposition Study

    ST. PAUL, Minn. –The U.S. Army Corps of Engineers, St. Paul District, is seeking public input from now until Feb. 16, 2021, on its recently completed draft disposition study for the Upper St. Anthony Falls Lock and Dam.
  • Soldier's past drives her passion to support U.S., partner communities in Europe & Africa

    USACE recognized Master Sgt. Betsy Weintraub as its fiscal year 2020 Excellence in Contracting Awards Program - NCO of the Year during an online ceremony Dec. 9.
  • Corps Signs Partnership Agreement for Storm Sewer Repair Construction

    The U.S. Army Corps of Engineers Pittsburgh District has entered into a more than $200,000 project-partnership agreement with the city of McKeesport to complete storm sewer-system repairs at several locations within the city.
  • ERDC researcher awarded top honor from USACE

    Dr. Rebekah Wilson, a chemist with the U.S. Army Engineer Research and Development Center’s (ERDC) Construction Engineering Research Laboratory (CERL), says she found direction during her high school years when physical science and chemistry became her passions. The subjects made sense to her, and she easily found logical answers to seemingly difficult problems using math to predict reactions and create products.
  • Huntsville Center medical program works first VA project

    Huntsville Center’s Medical Initial Outfitting and Transition program awarded its first IO&T project for the Department of Veterans Affairs.
  • Comment period extended for the Draft Integrated Feasibility Report and Environmental Assessment for River Road in San Antonio, Texas

    U.S. Army Corps of Engineers Officials announce today the extension of the comment period for the Draft Environmental Assessment and Finding of No Significant Impact for the River Road Aquatic Ecosystem Restoration Feasibility Study in San Antonio, Texas to January 12, 2021.
  • Corps Certifies 10 Confined Space Instructors

    When Willie Maynard, Lockmaster at New Cumberland Locks and Dam, is asked to describe the most difficult confined space he ever encountered, he often refers to the crossover located at U.S. Army Corps’ of Engineers Pittsburgh District’s Emsworth Locks and Dams on the Ohio River.
  • Evaluation of Thin Flexible Pavements under Simulated Aircraft Traffic

    Abstract: A full-scale airfield pavement test section was constructed and trafficked by the U.S. Army Engineer Research and Development Center (ERDC) to evaluate the performance of relatively thin airfield pavement structures. The test section consisted of 16 test items that included three asphalt pavement thicknesses and two different aggregate base courses. The test items were subjected to simulated aircraft traffic to evaluate their response and performance to realistic aircraft loads and to evaluate the effect of reductions in tire pressure on thin asphalt pavement. Rutting behavior, pavement cracking, instrumentation response, and falling weight deflectometer response were monitored at selected traffic intervals. The results of this study were used to extend existing Department of Defense pavement design and evaluation techniques to include the evaluation of airfield pavement sections that do not meet the current criteria for aggregate base quality and minimum asphalt concrete surface thickness. These performance data were used to develop new aggregate base failure design curves using existing stress-based design methodology.
  • Environmental Quality Requirements Model Program Objective Memorandum Fiscal Years 2021–2025

    Abstract: This document describes the methodology used to evaluate the costs incurred by organizations involved in planning, programming, budgeting, and execution of the Army’s environmental programs and estimating those costs for future year planning cycles, this model is referred to as the Environmental Quality Requirements Model (EQRM). The EQRM is used to develop the budget positions as presented to Congress to obtain the Operations and Maintenance appropriations. These appropriations fund the Environmental Quality Program which includes Compliance, Conservation and Pollution Prevention requirements. The model encompasses the commands under the funding structure of the Deputy Chief of Staff – G9 Installations which includes the following: Installation Management Command, the Army National Guard, the Army Reserve Command, and the Army Materiel Command.