News Stories

  • April

    20-021 Corps seeks public input for Ice Harbor Master Plan Revision

    BURBANK, Wash.– The U.S. Army Corps of Engineers’ Walla Walla District (Corps) invites the public to provide scoping comments for its upcoming revision of the Ice Harbor Master Plan. The Corps will be accepting comments from May 1 through June 15, 2020.
  • Memphis Builders: Behind the mask

    Walking around the Alternate Care Facility construction site, people are usually focused on what workers are doing, not so much the people themselves. And if you’re like me, you’re also very focused on the ground as you don’t want to trip and fall over something as simple as a little cord. But, it’s important to get to know the people doing the work. They are the ones making this facility a reality after all. They are also the people sacrificing time with their families, working 12 hours a day and seven days a week.
  • Reading Ranger

    Since the COVID-19 concerns have forced Corps staff and visitors to our projects into practicing safe social distancing, the search is on for creative ways to continue doing our work, and Natural Resource Specialist Kara Wagner, a Park Ranger at Alum Creek Lake in Lewis Center, Ohio, found a great way to reach out to a young audience. 
  • Dover Dam Days Virtual Tour ​

    Visitors look forward to the annual tours of Dover Dam in May, but this year the public visits are canceled because of the COVID-19 restrictions – but the rangers aren't going to let that shut down the event.
  • Thank you: Building a facility of hope

    The team of people building a facility made to care for people who contract the COVID-19 virus are working around the clock to make sure that if our local hospitals can't handle the caseload at that time, no one gets turned away. We want to thank all of our workers out there making this alternate care center ha reality. No matter what part of the team a worker is on, each is important and contributes an invaluable knowledge and skill to this facility of hope and care.
  • Space Force Marks 25 Years of GPS

    The Global Positioning System, better known as GPS, marks its 25th year of operation Apr. 27, 2020. On this date in 1995, the system reached full operational capability, meaning the system met all performance requirements. U.S. Air Force Space Command formally announced the milestone three months later.
  • MKARNS Nav Notice SWL 20-24 Dredging and Sailing Instruction Update NM 23, NM 49.9

    MKARNS - Dredging at NM 23(noted in SWL 20-23) is complete and the sailing instruction (noted in SWL 20-05) is lifted.
  • PUBLICATION NOTICE: Baldcypress (Taxodium distichum) at the Wallisville Lake Project: A Review of Applicable Literature and Management Considerations

    Abstract: Changing hydropatterns within the Wallisville Lake Project, near the mouth of the Trinity River in Chambers and Liberty Counties, Texas, have the potential to alter baldcypress forest resiliency. Increasing water levels support saltwater barrier operations while maintaining navigation and recreational access. However, potential impacts of increased water levels on the baldcypress forests are of particular concern because these ecosystems provide unique ecological value and wildlife habitat. The maintenance, succession, and resiliency of baldcypress under various flooding, salinity, and inundation regimes remain poorly defined and pose challenges to resource managers. This report reviews available literature pertaining to salinity and inundation impacts to baldcypress forests. Specific emphasis is placed on the ecological effects of water quality and quantity on the health and persistence of baldcypress. The information gathered in this report is intended to supplement material in the Wallisville Lake Project Water Control Manual to improve management of baldcypress forest conditions and avoid negative ecological impacts. Additionally, this report provides management considerations designed to maintain or enhance baldcypress forests within the Wallisville Lake Project.
  • New York and New Jersey Harbor Anchorages Study takes crucial step

    A U.S. Army Corps of Engineers study aimed at improving navigation and generating transportation-cost savings for deep-draft ships using New York and New Jersey Harbor terminals reached a key milestone Thursday.
  • Army awards Harris with Lean Six Sigma Master Black Belt

    Harris is the 163rd member to be awarded Master Black Belt in the Army and currently one of six Corps of Engineers’ MBBs since the Army Lean Six Sigma deployment began in 2005.

News Releases

  • 20-021 Corps seeks public input for Ice Harbor Master Plan Revision

    BURBANK, Wash.– The U.S. Army Corps of Engineers’ Walla Walla District (Corps) invites the public to provide scoping comments for its upcoming revision of the Ice Harbor Master Plan. The Corps will be accepting comments from May 1 through June 15, 2020.
  • Memphis Builders: Behind the mask

    Walking around the Alternate Care Facility construction site, people are usually focused on what workers are doing, not so much the people themselves. And if you’re like me, you’re also very focused on the ground as you don’t want to trip and fall over something as simple as a little cord. But, it’s important to get to know the people doing the work. They are the ones making this facility a reality after all. They are also the people sacrificing time with their families, working 12 hours a day and seven days a week.
  • Reading Ranger

    Since the COVID-19 concerns have forced Corps staff and visitors to our projects into practicing safe social distancing, the search is on for creative ways to continue doing our work, and Natural Resource Specialist Kara Wagner, a Park Ranger at Alum Creek Lake in Lewis Center, Ohio, found a great way to reach out to a young audience. 
  • Dover Dam Days Virtual Tour ​

    Visitors look forward to the annual tours of Dover Dam in May, but this year the public visits are canceled because of the COVID-19 restrictions – but the rangers aren't going to let that shut down the event.
  • Thank you: Building a facility of hope

    The team of people building a facility made to care for people who contract the COVID-19 virus are working around the clock to make sure that if our local hospitals can't handle the caseload at that time, no one gets turned away. We want to thank all of our workers out there making this alternate care center ha reality. No matter what part of the team a worker is on, each is important and contributes an invaluable knowledge and skill to this facility of hope and care.
  • Space Force Marks 25 Years of GPS

    The Global Positioning System, better known as GPS, marks its 25th year of operation Apr. 27, 2020. On this date in 1995, the system reached full operational capability, meaning the system met all performance requirements. U.S. Air Force Space Command formally announced the milestone three months later.
  • MKARNS Nav Notice SWL 20-24 Dredging and Sailing Instruction Update NM 23, NM 49.9

    MKARNS - Dredging at NM 23(noted in SWL 20-23) is complete and the sailing instruction (noted in SWL 20-05) is lifted.
  • PUBLICATION NOTICE: Baldcypress (Taxodium distichum) at the Wallisville Lake Project: A Review of Applicable Literature and Management Considerations

    Abstract: Changing hydropatterns within the Wallisville Lake Project, near the mouth of the Trinity River in Chambers and Liberty Counties, Texas, have the potential to alter baldcypress forest resiliency. Increasing water levels support saltwater barrier operations while maintaining navigation and recreational access. However, potential impacts of increased water levels on the baldcypress forests are of particular concern because these ecosystems provide unique ecological value and wildlife habitat. The maintenance, succession, and resiliency of baldcypress under various flooding, salinity, and inundation regimes remain poorly defined and pose challenges to resource managers. This report reviews available literature pertaining to salinity and inundation impacts to baldcypress forests. Specific emphasis is placed on the ecological effects of water quality and quantity on the health and persistence of baldcypress. The information gathered in this report is intended to supplement material in the Wallisville Lake Project Water Control Manual to improve management of baldcypress forest conditions and avoid negative ecological impacts. Additionally, this report provides management considerations designed to maintain or enhance baldcypress forests within the Wallisville Lake Project.
  • New York and New Jersey Harbor Anchorages Study takes crucial step

    A U.S. Army Corps of Engineers study aimed at improving navigation and generating transportation-cost savings for deep-draft ships using New York and New Jersey Harbor terminals reached a key milestone Thursday.
  • Army awards Harris with Lean Six Sigma Master Black Belt

    Harris is the 163rd member to be awarded Master Black Belt in the Army and currently one of six Corps of Engineers’ MBBs since the Army Lean Six Sigma deployment began in 2005.

Mississippi Valley Division

Institute for Water Resources

South Pacific Division

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,730
Follow Us