EP 1110-1-8 Construction Equipment Ownership and Operating Expense Schedule

Engineering Pamphlet (EP) 1110-1-8 establishes predetermined equipment ownership and operating expense rates for construction equipment. It also establishes a method to calculate equipment ownership and operating expense rates for construction equipment when the predetermined rates are not considered appropriate. The overall intent of this pamphlet is to determine equipment costs that are fair and reasonable.

EP 1110-1-8 applies to all USACE Commands. The complete text of the EP 1110-1-8 is available at the Official Publications of the Headquarters website. The accompanying tables, factors, indices, lists, etc., are located below. Some information is the same for all regions and is located under “Information Common to All Regions.” Some information is region-specific and is listed below by Regions 1 through 12. See the map to the right and the maps under each region below for information on which geographic areas make up each region.

 

Current Rates

The following components are unique to each region, and can be found beneath each region's section below:

  • Hourly Equipment Ownership and Operating Expense (formerly Tables 2-1 and 2-2) (view the index here)
  • Equipment Age Adjustment Factors for Ownership Cost (formerly Table 3-1)
  • Equipment Age Adjustment Factors for Standby Cost (formerly Table 3-2)
  • Local Area Factors (Appendix B)
  • Example Calculations

All other information can be found in the Information Common to all Regions section.

Collapse All Expand All
Expand List item 25342Collapse List item 25342  Information Common to All Regions

The following components are applicable to all 12 geographic regions.

Expand List item 25257Collapse List item 25257  Region 1 - Northeast
Expand List item 25264Collapse List item 25264  Region 2 - Mideast
Expand List item 25265Collapse List item 25265  Region 3 - Southeast
Expand List item 25266Collapse List item 25266  Region 4 - North Central
Expand List item 25267Collapse List item 25267  Region 5 - Midwest
Expand List item 25268Collapse List item 25268  Region 6 - Southwest
Expand List item 25269Collapse List item 25269  Region 7 - West
Expand List item 25270Collapse List item 25270  Region 8 - Northwest
Expand List item 25271Collapse List item 25271  Region 9 - Alaska
Expand List item 25272Collapse List item 25272  Region 10 - Hawaii
Expand List item 25273Collapse List item 25273  Region 11 - Puerto Rico
Expand List item 25274Collapse List item 25274  Region 12 - Kwajalein

Historic Rates

Past editions of the US Army Corps of Engineers EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, are available from 1981 to the present. If a year is not listed as a selection, then the pamphlet was not published in that year. To view a copy in PDF format, please select the required year and region.