Results:
Tag: Southeastern Power Administration
Clear
  • Nashville District providing hydropower with aging equipment, rehabs underway

    NASHVILLE, Tenn. (May 10, 2013) -- The U.S. Army Corps of Engineers Nashville District produces about $40 million annual revenue by converting water’s energy into 3.4 billion kilowatt hours of electricity in 28 generators at its nine Hydropower Plants in the Cumberland River Basin.
  • Corps hosts University of Tennessee Martin students at Lake Barkley

    KUTTAWA, Ky. (Feb. 28, 2013) – U.S. Army Corps of Engineer, Nashville District employees at the Lake Barkley Resource Center, Lock and Dam hosted Students and faculty from the University of Tennessee at Martin Hydrology and Hydraulics class for a Science, Technology, Engineering and Math tour today.
  • Dale Hollow Dam plugs into its own power source

    CELINA, Tenn. (Feb. 26, 2013) – U.S. Army Corps of Engineers Nashville District electricians at Dale Hollow Dam on the Obey River are plugging into the dam’s power source as part of a sustainability program initiative.
  • Barkley hydropower rehabilitation gets a 270-ton lift

    KUTTAWA, Ky. (Aug. 16, 2012) – Work crews here at Barkley Power Plant removed a 270-ton rotor assembly today from a crippled hydropower unit damaged 18 months ago by an electrical fire. The heavy lift enables the U.S. Army Corps of Engineers Nashville District to move forward with the generator’s rehabilitation.