Results:
Tag: civil works
Clear
  • Corps breaks ground on Tule River Spillway Enlargement Project

    The U.S. Army Corps of Engineers Sacramento District, along with local and federal partners, have broken ground on the Tule River Spillway Enlargement Project at Success Lake near Porterville, California. The project is a cooperative effort between USACE, the Central Valley Flood Protection Board, the California Department of Water Resources, and the Lower Tule River Irrigation District to raise the gross pool elevation of Success Lake, reducing the downstream risk of flooding while also increasing the water supply capability of the reservoir.
  • PDT awards drainage channel cleanout contract

    Congratulations to the Iron Mines Creek Channel Cleanout Project Delivery Team (PDT). The PDT recently reached its contract award milestone, awarding the contract to small business contractor Innovative Performance Construction. Work on the contract includes the cleanout of 3.9 miles of the Iron Mines Creek channel located in Marked Tree, Poinsett County, Arkansas.
  • Gathright Dam pulse release canceled as river conditions ‘favorable’

    NORFOLK, Va. – Norfolk District, U.S. Army Corps of Engineers officials have canceled Wednesday’s scheduled pulse release at Gathright Dam in the Alleghany Highlands of Virginia near Covington.
  • Army Corps of Engineers New York District heralds the arrival of the largest container ship to Call in the Port

    The CMA/CGM BRAZIL arrived at the Port of New York and New Jersey, Sept. 12. The arrival of the CMA/CGM Brazil was made possible as a result of the Harbor Deepening Project — a multi-year effort by the U.S. Army Corps of Engineers, New York District and The Port Authority of New York and New Jersey.
  • Mosquito treatment set for Monday at Craney Island

    NORFOLK, Va. – Norfolk District, U.S. Army Corps of Engineers will conduct another round of aerial mosquito treatment Monday over federal property on Craney Island.
  • District awards contract for Farrenburg Levee Phase 5 project

    Congratulations to the Farrenburg Levee Phase 5 Project Delivery Team (PDT) for advancing their project to the important Contract Award milestone. The team awarded the contract to VuCon, LLC. on August 30. Work the contractor will perform consists of replacing two culverts, which have reached their life expectancy,  that cross under the Farrenbeurg Levee, closing a gap in the levee and raising sections of the levee to the authorized grade. Drainage infrastructure like this is a vital part of the overall levee protection system.
  • Nansemond project’s Restoration Advisory Board to meet Thursday

    SUFFOLK, Va. — The environmental mission at Former Nansemond Ordnance Depot remains a priority for the U.S. Army Corps of Engineers. The project’s quarterly Restoration Advisory Board meeting is set for 6:15 to 8:15 p.m. Thursday via Webex.
  • Norfolk District cancels Gathright Dam pulse release

    NORFOLK, Va. – Norfolk District, U.S. Army Corps of Engineers officials have canceled Wednesday’s scheduled pulse release at Gathright Dam in the Alleghany Highlands of Virginia near Covington.
  • North Landing Bridge replacement project clears major hurdle

    NORFOLK, Va. – A U.S. Army Corps of Engineers project aimed at replacing North Landing Bridge took a crucial step forward this week. Lt. Gen. Todd Semonite, chief of engineers and USACE commanding general, signed a Chief’s Report on Tuesday, recommending the North Landing Bridge Replacement Study’s findings for authorization by Congress.
  • Army Corps of Engineers announces signing of Chief’s Report for Raritan Bay and Sandy Hook Bay, Highlands, New Jersey, Coastal Storm Risk Management Project

    Lt. Gen. Todd T. Semonite, Chief of Engineers, U.S. Army Corps of Engineers signed the Raritan Bay and Sandy Hook Bay, Highlands, New Jersey, Coastal Storm Risk Management Chief's Report. The next step will be the approval of the Chief’s Report by the Assistant Secretary of the Army for Civil Works.