Results:
Tag: great lakes
Clear
  • Soo Locks closing for seasonal repair, maintenance

    DETROIT- The Soo Locks in Sault Ste. Marie, Michigan will close to marine traffic beginning 11:59 p.m. January 15 through 12:01 a.m. March 25 to perform critical maintenance. The operating season is fixed by federal regulation and is driven in part by the feasibility of vessels operating in typical ice conditions. Every year, the Corps uses the winter period to perform maintenance to keep the Soo Locks operating. The Soo Area Office team works long hours in extreme conditions to complete a significant amount of maintenance during this annual closure period. The work they perform is unique, especially given the harsh northern Michigan conditions they work in.
  • U.S. Army Corps of Engineers to resume Rochester Harbor east pier repairs Spring 2021

    The U.S. Army Corps of Engineers, Buffalo District, and its contractor, Dean Marine & Excavating, Inc., are scheduled to resume repairs of the Rochester Harbor east pier, located in Rochester, New York, in Spring 2021. The remaining repairs, the concrete cap and pier lighting, are expected to be completed within a month of resuming construction.
  • High water levels and wave events increase safety hazards

    The U.S. Army Corps of Engineers urges caution around Great Lake piers, breakwaters and jetties, particularly during times of high wind and wave events. Many accidents and incidents near harbor structures occur during the turbulent weather season late in the year and higher than normal water levels pose an added threat. The lakeshore attracts local residents and visitors alike and some may not be aware of the powerful impacts that strong winds, storms and high water levels can bring. Dangers of High Water Levels, Waves. The Great Lakes are experiencing higher than normal water levels, which bring safety hazards such as submerged breakwaters, dangerous rip currents and electric shock risks.
  • Ohio & Erie Canal project complete, Project Team to host webinar

    The Ohio & Erie Canal project delivery team will host a webinar October 15th at 2pm EST, to celebrate the completion of the Ohio & Erie Canal Aquatic Nuisance Species Barrier Project, that has the primary benefit of protecting the highly valuable commercial and recreational fisheries in Ohio and the Great Lakes.
  • PROPOSED PLAN AVAILABLE FOR PUBLIC COMMENT FOR THE BALANCE OF PLANT AND GROUNDWATER OPERABLE UNITS OF THE NIAGARA FALLS STORAGE SITE

    The U.S. Army Corps of Engineers Buffalo District is pleased to announce the availability of the Proposed Plan, Balance of Plant and Groundwater Operable Units, Niagara Falls Storage Site (NFSS). The proposed plan and a fact sheet are available on the web at: https://www.lrb.usace.army.mil/Missions/HTRW/FUSRAP/Niagara-Falls-Storage-Site/ in their respective sections.
  • USACE Buffalo District awards contract for Great Sodus Bay seawall repair

    The U.S. Army Corps of Engineers Buffalo District awarded a $3.86 million contract to Michigan-based Great Lakes Dock & Materials, L.L.C, on August 21 for repairs to the east breakwater in the Great Sodus Harbor, located in Sodus Bay, Village of Sodus Point, Wayne County, NY.
  • Corps of Engineers begins Buffalo Harbor dredging

    The U.S. Army Corps of Engineers, Buffalo District began operations and maintenance (O&M) dredging of the Buffalo Harbor, a commercial deep draft harbor, September 8.
  • Corps of Engineers report Great Lakes water levels remain high as fall storms approach

    U.S. Army Corps of Engineers officials report despite seasonal declines, Great Lakes water levels remain high as fall storms approach. “The Corps of Engineers urges anyone impacted by high water levels last fall to prepare for similar or worse impacts in the coming months,” Detroit District Great Lakes Hydraulics and Hydrology Office Chief, John Allis said. The Corps’ Detroit District is responsible for monitoring, forecasting, collecting and disseminating Great Lakes water level information. For the most up-to-date Great Lakes water level information visit the district’s website at www.lre.usace.army.mil/Missions/Great-Lakes-Information.
  • Great Lakes Fishery and Ecosystem Restoration program launches new webpage

    The U.S. Army Corps of Engineers and the Great Lakes Fishery Commission are proud to announce the new Great Lakes Fishery and Ecosystem Restoration (GLFER) Program web page: https://www.lrd.usace.army.mil/Home/Great-Lakes-Fishery-Ecosystem-Restoration-Program/
  • Detroit District awards contract for maintenance at Soo Locks

    The U.S. Army Corps of Engineers, Detroit District, announces a contract award to replace aging equipment on the MacArthur Lock in Sault Ste. Marie, Michigan. The more than $7 million contract was awarded to Ryba Marine Construction Co. The contract (award number W911XK20C0020) was for $ $7,276,650.00 to replace the World War II-era tainter valves for the MacArthur Lock. Tainter valves are used to control the flow of water used for raising and lowering the water level in the lock during a lockage. The MacArthur Lock has two sets of tainter valves, one upstream set and one downstream set. “The Corps takes pride in performing maintenance to keep its existing facilities operational for long durations, while simultaneously planning for replacement and renewal as required to ensure the locks remain a resilient link in the Great Lakes Navigation System,” said Kevin Sprague, area engineer, Soo Area Office.