Abstract: A linked watershed model was evaluated on three watersheds within the U.S.: (1) House Creek Watershed, Fort Hood, TX; (2) Calleguas Creek Watershed, Ventura County, CA; and (3) Patuxent River Watershed, MD. The goal of this demonstration study was to show the utility of such a model in addressing water quality issues facing DoD installations across a variety of climate zones.
In performing the demonstration study, evaluations of model output with regards to accuracy, predictability and meeting regulatory drivers were completed. Data availability, level of modeling expertise, and costs for model setup, validation, scenario analysis, and maintenance were evaluated in order to inform installation managers on the time and cost investment needed to use a linked watershed modeling system. Final conclusions were that the system evaluated in this study would be useful for answering a variety of questions posed by installation managers and could be useful in developing management scenarios to better control pollutant runoff from installations.