On Sept. 5, 2019, a long unknown and undetected flaw became an impending failure at Bonneville navigation lock.
More than 70 feet underwater, sections of rebar, threaded through 40,000 pounds of concrete, had stretched and bent until the strain snapped them. The now deformed steel bars were no match for the force of water that came every time the lock filled with water to pass vessels through the lock.