• IWR Seeking Permanent Computer Scientist, GS-12/13 (1550 Series)

    Looking for a great place to work? The Institute for Water Resources, Water Resources Center, is
  • Corps of Engineers share May-Oct. water level outlook

    U.S. Army Corps of Engineers Hydraulics and Hydrology officials forecast Great Lakes water levels to continue seasonal rise. From the shores of Lake Superior, Detroit District Watershed Hydrology Section Chief Keith Kompoltowicz discusses the latest six-month water level forecast in the seventh ‘On the Level’ video, available on the district’s YouTube page at https://youtu.be/imwYDUBbMd0. “Lake Superior’s water level in April was about an inch below its long-term average,” according to Kompoltowicz. “Looking at the forecast for the next 6 months, Superior’s level should remain near average. In looking at the rest of the Great Lakes system, Lakes Michigan-Huron, St. Clair, Erie and Ontario are above their respective long term average levels, but well below the record high levels recently experienced.”
  • USACE Vicksburg District temporarily closes road and area around Wallace Lake Dam

    VICKSBURG, Miss. – The U.S. Army Corps of Engineers (USACE) Vicksburg District will close road and foot traffic access to Wallace Dam starting today.
  • Harry S. Truman Lake providing public opportunities for Master Plan revision

    WARSAW, Mo. - The U.S. Army Corps of Engineers has begun the process of revising the Harry S. Truman Dam & Reservoir Master Plan, which was last updated in October 1988. The revision would bring the Master Plan up to date with current policy and regulations, land usage or designations, as well as consider current and projected visitation and recreational trends. “So far, we hosted one of three public meetings for the Master Plan revision and have heard several comments on key recreation and natural resource management actions for the lake,” said Jim Sandberg, Operations Project Manager at Harry S. Truman Lake. “Comments provided online or at these public meetings are taken into account on future management actions and will be considered and evaluated as the new Master Plan evolves.” The Master Plan is the strategic land use management document that guides the comprehensive management and development of all recreational, natural, and cultural resources throughout the life of the project. The Master Plan guides efficient and cost-effective management, development, and use of project lands. It is a vital tool for the responsible stewardship and sustainability of project resources for the benefit of present and future generations.
  • Controversial, successful Virginia Beach ecosystem restoration project to hold open-house event

    The second phase of a large-scale hard reef habitat restoration project funded by the Norfolk District, U.S. Army Corps of Engineers and City of Virginia Beach sees forward movement May 17 at the Brock Environmental Center, Virginia Beach.
  • Auxiliary Lock to open for season at Lock 14

    The U.S. Army Corps of Engineers, Rock Island District, announces the auxiliary lock, located at Locks and Dam 14 in Pleasant Valley, Iowa, will open May 27 for recreational boating traffic. Every weekend until Sept. 5, the lock will be open for recreational use on Fridays from 4-10 p.m. and Saturdays and Sundays from Noon-10 p.m. In addition, the auxiliary lock will be open Noon-10 p.m. on the Memorial Day, 4th of July, and Labor Day holidays and until midnight on Friday, August 12, to assist recreational boaters attending Tugfest activities and the fireworks display.
  • Completed Below Island 9 Project to benefit navigation industry, public

    Congratulations to the Memphis District Below Island 9 Project Delivery Team for achieving total project completion on May 6, 2022. The project area, located in Lake County, Tennessee, was identified as a low water problem spot by local partners in the navigation industry. This area has been dredged by the Memphis District’s Dredge Hurley in 2020 and 2021, yet the problem spot persisted. To come up with a long term solve, a project delivery team came together to complete a dike construction project.
  • BBSEER Project Delivery Team Meeting moved to June 1 2022

    The U.S. Army Corps of Engineers Jacksonville District is postponing the Project Delivery Team (PDT) Meeting for the Biscayne Bay and Southeastern Everglades Ecosystem Restoration (BBSEER) Project Study from Wednesday, May 18, 2022, to Wednesday, June 1, from 10 a.m. to 12 p.m.
  • Introducing Louisville District’s first ever River Ranger: Lisa Freeman

    The U.S. Army Corps of Engineers Louisville District manages nine locks and dams: seven on the Ohio River and two on the Green River in Kentucky. The Ohio River projects operate 24 hours a day, 365 days a year, serving both the towing industry and recreational boaters. It is a known fact that USACE is the steward of the lands and waters located on its projects. The Corps’ guiding philosophy for natural resource management is to manage, conserve, and improve these natural resources that contribute to an increased quality of American life, now and for posterity. However, this it not only taking place at lake projects that provide recreational activities for the public, but also at the locks and dams.