The spillway flow test which was scheduled for April 10 at Gavins Point Dam has been postponed due to inclement weather. The new test date is Tuesday April 16. The purpose of the test is to gain additional information on the current condition of the spillway after interim repairs have been made. The test is being conducted as part of the ongoing rehabilitation and repair of the damage from the Missouri River Flood of 2011.