Ceremonial groundbreaking for the Phase 3 project to replace an outdated Combined Sewer Overflow system with a modern system that separates sanitary sewer wastewater from storm water. This minimizes inflow/infiltration during large rain events, improves local water quality, and reduces maintenance costs associated with cleaning/repairing the old system. Funded through the Section 594 Program, total project costs are $1.33M ($1M Federal/$333K non-Federal)