VICKSBURG, Miss – The U.S. Army Corps of Engineers Vicksburg District (USACE-MVK) continues to advance interim risk reduction measures (IRRM) at Arkabutla Dam in Northwest Mississippi. Contractor Frontier Services, Inc., began construction and equipment mobilization in early May.
Currently, drill pads are being installed for piezometers, automated instruments used for monitoring groundwater pressure. Relief wells, which act like valves to relieve the water pressure, allow excess water to be diverted safely, and serve to prevent sand boils, are scheduled to follow. The additional piezometers increase the USACE-MVK’s monitoring ability by sending data hourly to the technical team, allowing them to analyze conditions in real time.