• Power of the pump, no telework

    While many people are at home working in front of a computer, the U.S. Army Corps of Engineers have people out in the field operating equipment and facilities that, at this point in time, cannot be controlled from a workstation at home. The Graham Burke Pumping Plant is one of those “pieces” of equipment that requires people to be on-site for safe operation. Pumping Plant Operator Leaderman William “Billy” Ray and Pumping Plant Operator John “Brady” Foran are two of those valuable employees who are called upon to run one of the Corps’ most valuable facilities.
  • U.S. Army Corps of Engineers Turns Over 7 Alternate Care Sites Over the Weekend

    Between Friday, April 17 and Monday, April 20, the U.S. Army Corps of Engineers finished seven alternate care sites in response to COVID-19. Together with the previous three completed locations, this brings the total to 10. This weekend the Corps of Engineers finished the Alaska Airlines Center in Anchorage, AK; Wisconsin State Fair Expo Center in West Allis, WI; Gibson Medical Center in Albuquerque, NM; Miyamura High School in Gallup, NM; and the Miami Beach Convention Center in Miami Beach, FL. The Corps of Engineers is turning over two sites today. They are the Suburban Collection Showplace in Novi, MI and Westchester County Center in White Plains, NY. 
  • Charleston flood risk management study seeks public feedback

    CHARLESTON, S.C. — After months of studying, modeling and workshops, the U.S. Army Corps of
  • Corps, multiple teams ready to construct Memphis ACF

    As the U.S. Army Corps of Engineers Memphis District continues to work in support of the Federal Emergency Management Agency (FEMA) - and in coordination with other federal, state, local, tribal partners, and our prime contractor AECOM – to build Memphis' Alternate Care Facility and to synchronize the interagency response to the COVID-19 Pandemic, multiple teams came together yesterday to meet and prepare for a very busy month ahead.
  • Bowser Administration, U.S. Army Corps Announce Set-Up of DC Convention Center into Alternate Care Facility

    In coordination with the Bowser Administration, the U.S. Army Corps of Engineers, Baltimore District, has issued a design/build contract to Hensel Phelps Construction Co. to convert the Walter E. Washington Convention Center into an alternate care facility to support the District’s response to coronavirus (COVID-19). The goal is to never need to use the Convention Center, but by the first week of May, 500 beds will be ready.
  • USVI and Army Corps of Engineers to construct COVID alternate care facility in St. Croix

    SAVANNAH, Ga. – In a joint effort, the U.S. Virgin Islands, the U.S. Army Corps of Engineers and the Federal Emergency Management Agency will cooperate to construct an Alternate Care Facility (ACF) for COVID 19 patients at the National Guard Regional Training Institute in St. Croix beginning April 18, 2020.
  • Mobile District Temporarily Closes Old Federal Campground

    U.S. Army Corps of Engineers Mobile District announced today that it has temporarily closed Old Federal Campground at the USACE Lake Sidney Lanier recreation area, heavily eroded by high-water events in recent years.
  • Army Corps Oversees Progress of Alternate Care Facility Construction at State University of New York College at Old Westbury, Long Island, N.Y.

    Construction of the alternate care facility is progressing at the State University of New York College at Old Westbury on Long Island to facilitate care for COVID-19 and non-COVID-19 patients.
  • General De Gaulle Dr. westbound to close more frequently between Behrman Pl. and MacArthur Blvd.

    Since April 1, 2020, the U.S. Army Corps of Engineers, New Orleans District has periodically closed the left lane of General De Gaulle Drive westbound to traffic between Behrman Place and MacArthur Boulevard for work related to the Southeast Louisiana Urban Flood Control project. Starting Monday, April 20, the construction crew will begin pouring concrete base slabs. As a result, concrete trucks will make frequent deliveries, causing the left lane to be closed more often between the hours of 9 a.m. and 3 p.m.
  • Discovering the Mural in Permafrost

    In the forests of Fox, Alaska, carved into a frozen hillside is a unique manmade 350-meter long research tunnel. Situated on a 16-acre parcel near the confluence of Goldstream and Glenn Creeks, the U.S. Army Corps of Engineers Research and Development Center’s Cold Regions Research and Engineering Laboratory’s Permafrost Tunnel Research Facility was excavated deep into a large block of discontinuous permafrost that has been going through several recent periods of expansion. The expansion project began back in 2011, taking advantage of the digging seasons when the ground is at its coldest, with an overall project goal of expanding the tunnel facility to better support ongoing and growing research and engineering needs. The most recent expansion effort, this year, has added 300-feet of new tunnel, improved 200 feet of the existing tunnel and added links between the old and new tunnel sections at several locations, to include at an interface between subsurface bedrock and overlying gravels.