Hurley docked after another successful dredging season
IN THE PHOTO, anchors used to keep the Dredge Hurley in place, now not needed as the Hurley is now docked at Ensley Engineer Yard after another long but successful season of dredging the Mississippi River. Adrian Pirani, Dredge Hurley master, said the crew successfully removed a little more than 8 million cubic yards of sediment this season. The season was shorter than last year due to the Hurley needing maintenance done, which required the Hurley be placed on a larger dry dock down south for a few months earlier this year. (USACE photos by Jessica Haas)

Download Image: Full Size (4.18 MB)
Tags:
Photo by: Jessica Haas |  VIRIN: 201204-A-LD870-1008.JPG