Results:
Tag: AR
Clear
  • Engineering Division makes recruiting top talent a priority

    The U.S. Army Corps of Engineers is always looking to add talented individuals to their world-class team. When comparing USACE to large federal agencies, USACE ranks number two on the Best Places to Work list, behind only NASA. 
  • USACE Vicksburg District begins drawdown of Thatcher Lock and Dam

    VICKSBURG, Miss. – The U.S. Army Corps of Engineers Vicksburg District will begin pool draw down at Thatcher Lock and Dam on Nov. 19, 2021, to make repairs to the seal of the hinge crest gate. The pool at Thatcher Lock and Dam is expected to fall as much as six inches per day, from 77 to 72 feet. The USACE Vicksburg District is working with City of Camden personnel to create a slower draw down from 73 to 72 feet to closely monitor the city’s water supply intake pipes. It is possible that the draw down might have to continue to 71 feet if the inspection cannot be completed at 72 feet.
  • Hololens 2: The future of Engineering and Design

    Virtual reality has become a very real tool in the field of engineering.
  • ERDC delivers augmented reality solutions in the fight against COVID-19

    Scientists and engineers at the U.S. Army Engineer Research and Development Center (ERDC) are using augmented reality technology to assist peers throughout the U.S. Army Corps of Engineers (USACE) in virtually conducting site assessments of alternate care facilities (ACFs) across the country. Augmented reality technology, developed by researchers at the ERDC Information Technology Laboratory (ITL), offers a way for the USACE to assess potential ACF locations while assisting with social distancing and safety considerations.