Smithville Lake scheduled early drawdown in 2020
The U.S. Army Corps of Engineers conducts a two-foot drawdown bringing Smithville Lake to 862.20 mean sea level each December and hold it at that level through Apr. 15. This action will start a little sooner in 2020 to allow construction crews to work quickly and safely without the need to demobilize for spillway releases early in the project.

Download Image: Full Size (3.21 MB)
Tags:
Photo by: U.S. Army Corps of Engineers, Kansas City District |  VIRIN: 200909-A-CV967-001.JPG