US Army Corps of Engineers
U.S. Army Corps of Engineers Headquarters Website

Outside view of Tuttle Creek Lake stilling basin
Work continues on improving stability and drainage around the stilling basin walls. Here, workers construct concrete bases for post-tension anchors which will further secure the walls to the underlying bedrock. Installation of the 34 anchors is the most technical and time consuming phase of the Stilling Basin Rehabilitation Project at Tuttle Creek Lake.

Download Image: Full Size (2.26 MB)
Tags:
Photo by: Brian McNulty |  VIRIN: 200818-A-A1408-002.JPG