Ditch 251 Lower Ditch Cleanout Project
IN THE PHOTO, left, the CAO, PDT, and project partner Little River Drainage District’s Dustin Boatwright conduct a virtual pre-construction conference with contractor Babcock SDV, LLC to achieve a clear and mutual understanding of all contract requirements and to identify and resolve potential problems prior to work starting. The photo on right is a map of the project site.

Download Image: Full Size (1.09 MB)
Tags:
Photo by: Memphis District |  VIRIN: 200722-A-YI354-0001.JPG