Dam safety remains top priority admist COVID-19 challenges
The Omaha District dam safety team performs an inspection May 1, at Salt Creek Site 2, Olive Creek Dam, Neb., to check for erosion and if the outlet channel in satisfactory condition. This was the first inspection the team has performed since the COVID-19 pandemic began.

Download Image: Full Size (3.29 MB)
Tags:
Photo by: Nyime Gilchrist |  VIRIN: 200512-A-UX239-650.JPG