US Army Corps of Engineers
USACE website

Final concrete shell placement sets project back on critical path
The U.S. Army Corps of Engineers Nashville District and its contractor partner Johnson Brothers put a 1.7 million pound concrete shell into position Feb. 2, 2020 on the riverbed on downstream end of Kentucky Lock where it will be part of a coffer dam and eventually a permanent part of the new lock wall for the Kentucky Lock Addition Project. It is the last of 10 shells. The lock is located at Kentucky Dam, which is a Tennessee Valley Authority project at Tennessee River mile 22.4. (USACE Photo by Mark Rankin)

Download Image: Full Size (6.67 MB)
Tags:
Photo by: Mark Rankin |  VIRIN: 200202-A-BO243-2262.JPG