US Army Corps of Engineers
Headquarters

STURGIS
Removal of the reactor pressure vessel from the STURGIS in May 2017 resulted in the largest single reduction in residual radioactivity since the removal of radiological waste began in October 2015.

Download Image: Full Size (0.03 MB)
Photo by: File photo |  VIRIN: 171011-A-CE999-902.JPG