Ship Simulation Completed for Post 45 Project
The Charleston District conducted ship simulations at the Engineer Research and Development Center in Vicksburg, Miss. The simulations test the conditions of the current design for the Post 45 harbor deepening project to finalize plans for the future of the harbor.