Contractor's field crew lifts a super-sack containing micro-scale zero-valent iron/organic carbon into position above the mixing tank so that the material can be blended into the amendment formulation that will be injected into groundwater via hydraulic fracturing.
Contractor's field crew lifts a super-sack containing micro-scale zero-valent iron/organic carbon into position above the mixing tank so that the material can be blended into the amendment formulation that will be injected into groundwater via hydraulic fracturing.

Download Image: Full Size (0.2 MB)
Tags: usace
Photo by: Delma Stoner |  VIRIN: 120403-A-GR611-001.JPG