USACE's Afghanistan Engineer District-South meets 99 percent of 1st quarter 2012 construction goal
AFGHANISTNA — Air Force Col. Benjamin Wham, U.S. Army Corps of Engineers Afghanistan Engineer district-commander(second from left), and Mike Fellenz (center), the Farah Resident Office project engineer, discuss the status of construction at Camp Sayar, in Farah province Nov. 30, 2011.

Download Image: Full Size (0.05 MB)
Tags:
Photo by: U.S. Army Corps of Engineers |  VIRIN: 120119-A-CE999-004.JPG