Completion of critical project milestone celebrated for Tamiami Trail One-Mile Bridge
In addition to constructing the one-mile bridge, 9.7 miles of roadway will be modified to allow for increased water levels in the L-29 Canal that will flow beneath the bridge. Seventy-five percent of the roadway has been completed, and the Tamiami Trail Modifications project is scheduled to be completed by the end of the year.

Download Image: Full Size (0.37 MB)
Photo by: Aerial Photography, Inc. |  VIRIN: 130312-A-CE999-025.JPG