U.S. Army Corps of Engineers announces publication of 2026 nationwide permits
Jan. 08, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today the publication of the 2026 nationwide permits in the Federal Register. The 56 reissued and one new...
Read More
U.S. Army Corps of Engineers announces finalization of nationwide permits
Jan. 07, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today that it will reissue 56 existing nationwide permits and issue one new permit for work in wetlands and...
Read More
A Soldier and three other civilian men document events in an airfield tower.
USACE Black Start Exercise Brings Light to Readiness
Nov. 20, 2025 | 
News
Increased installation readiness is the goal of the Black Start Exercise Program, a joint U.S. Army Corps of Engineers-led initiative, to test and...
Read More
Army Executes POTUS Directive on Ambler Road Project
Oct. 23, 2025 | 
News Release
President Donald J. Trump has approved the appeal of the Alaska Industrial Development and Export Authority (AIDEA), directing the U.S. Army Corps of...
Read More
USACE introduces new Regulatory Request System module
Sep. 22, 2025 | 
News Release
The U.S. Army Corps of Engineers announced today the launch of a new “No Permit Required” module on its Regulatory Request System (RRS), an innovative...
Read More
Army Corps of Engineers begins implementing policy to increase America’s energy generation efficiency
Sep. 22, 2025 | 
News Release
Assistant Secretary of the Army for Civil Works Adam Telle today directed the U.S. Army Corps of Engineers to weigh whether energy projects that might...
Read More

HQ USACE News

Results:
Archive: April, 2020
Clear
  • April

    Power of the pump, no telework

    While many people are at home working in front of a computer, the U.S. Army Corps of Engineers have people out in the field operating equipment and facilities that, at this point in time, cannot be controlled from a workstation at home. The Graham Burke Pumping Plant is one of those “pieces” of equipment that requires people to be on-site for safe operation. Pumping Plant Operator Leaderman William “Billy” Ray and Pumping Plant Operator John “Brady” Foran are two of those valuable employees who are called upon to run one of the Corps’ most valuable facilities.
  • U.S. Army Corps of Engineers Turns Over 7 Alternate Care Sites Over the Weekend

    Between Friday, April 17 and Monday, April 20, the U.S. Army Corps of Engineers finished seven alternate care sites in response to COVID-19. Together with the previous three completed locations, this brings the total to 10. This weekend the Corps of Engineers finished the Alaska Airlines Center in Anchorage, AK; Wisconsin State Fair Expo Center in West Allis, WI; Gibson Medical Center in Albuquerque, NM; Miyamura High School in Gallup, NM; and the Miami Beach Convention Center in Miami Beach, FL. The Corps of Engineers is turning over two sites today. They are the Suburban Collection Showplace in Novi, MI and Westchester County Center in White Plains, NY. 
  • Discovering the Mural in Permafrost

    In the forests of Fox, Alaska, carved into a frozen hillside is a unique manmade 350-meter long research tunnel. Situated on a 16-acre parcel near the confluence of Goldstream and Glenn Creeks, the U.S. Army Corps of Engineers Research and Development Center’s Cold Regions Research and Engineering Laboratory’s Permafrost Tunnel Research Facility was excavated deep into a large block of discontinuous permafrost that has been going through several recent periods of expansion. The expansion project began back in 2011, taking advantage of the digging seasons when the ground is at its coldest, with an overall project goal of expanding the tunnel facility to better support ongoing and growing research and engineering needs. The most recent expansion effort, this year, has added 300-feet of new tunnel, improved 200 feet of the existing tunnel and added links between the old and new tunnel sections at several locations, to include at an interface between subsurface bedrock and overlying gravels.
  • Take time to think about your future needs for National Healthcare Decisions Day

    While April 16 was National Healthcare Decisions Day – a day set aside to take time to think about current and future healthcare needs – these needs take on new meaning when we are confronted with an unexpected healthcare challenge like the COVID-19 coronavirus.

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,765
Follow Us

News Releases

Results:
Archive: April, 2020
Clear
  • Vicksburg District to keep boat ramps, nature trails open at Mississippi lakes and provides new boating requirements

    VICKSBURG, Miss. – The U.S. Army Corps of Engineers (USACE) Vicksburg District will keep its boat ramps, nature trails and fishing areas at Arkabutla, Enid, Sardis and Grenada lakes open in north Mississippi. Arkabutla, Sardis, Grenada and Enid lakes are not included in the recreation areas that will be reopened through the governor’s April 17 order, which has allowed select state beaches, parks, reservoirs and other areas to reopen on a limited basis. The Vicksburg District’s visitor centers, interpretive centers, museums, field offices and select recreation site attractions, including campgrounds and beaches, across Mississippi, Louisiana and Arkansas have been closed to the public since March 20. These areas will remain closed until further notice.
  • JJ Mayes Wildlife Trace closure at Wallisville Lake Project

    WALLISVILLE, Texas – The U.S. Army Corps of Engineers Galveston District will close the J.J. Mayes Wildlife Trace at the Wallisville Lake Project on April 23 in order to improve the west non-overflow dam road to increase public safety.
  • PUBLICATION NOTICE: SPDAT Rainfall and Streamflow Analysis at Mobile, Alabama

    ABSTRACT: This Dredging Operations and Environmental Research (DOER) program technical note (TN) seeks to explain how the Storm and Precipitation Dredging Analysis Tool (SPDAT) can be used to determine dredging response to varying rainfall levels at a given site. This TN will focus on the historical dredging records in the Mobile Bay Ship Channel and rainfall levels in that area. The analysis presented in this TN will form the basis for how the tool methodology can be used to and compare rainfall and dredging records to determine response trends at other sites. The results from the tool analysis can inform dredging managers about how much dredging may be expected under similar rainfall or tropical storm conditions for future cycles.
  • PUBLICATION NOTICE: Analysis of Nearshore Placement of Sediments at Ogden Dunes, Indiana

    ABSTRACT: The harbor structures/shoreline armoring on the southern Lake Michigan shoreline interrupt sand migration. Ogden Dunes, Indiana, and the nearby Indiana Dunes National Lakeshore observed shoreline erosion due to engineered structures associated with Burns Waterway Harbor (east of Ogden Dunes) impeding natural east-to-west sediment migration. To remedy this, USACE placed over 450,000 cubic meters (m3) of dredged material post-2006 in the nearshore of Ogden Dunes. However, the effectiveness of nearshore placements for shoreline protection and littoral nourishment is not fully established. To improve nearshore placement effectiveness, USACE monitored the June/July 2016 placement and subsequent movement of 107,000 m3 of dredged material in the nearshore region at Ogden Dunes. This involved an extensive monitoring scheme (three bathymetry surveys, and two acoustic Doppler current profiler deployments), a Coastal Modeling System (CMS) numerical model of the changes following placement, and a prediction of sediment transport direction using the Sediment Mobility Tool (SMT). The SMT-predicted sediment migration direction was compared to observations. Observations indicated that between 10/11/2016 and 11/15/2016 the centroid of the sediment above the pre-placement survey moved 17 m onshore. These observations agreed with SMT predictions — onshore migration under storm and typical wave conditions. CMS accurately reproduced the hydrodynamic features.

Mississippi Valley Division