Results:
Tag: Corps of Engineers
Clear
  • Lake Cumberland park rangers recognized for decades of work

    SOMERSET, Ky. (March 13, 2013) – U.S. Army Corps of Engineers Nashville District personnel at Lake Cumberland unveiled an honorary display wall today to commemorate the service of park rangers during a ceremony at the Lake Cumberland Visitor’s Center.
  • Ground breaks for largest-ever Army Reserve land exchange

    Representatives from the Sacramento District attended a groundbreaking ceremony March 6, 2013, at the U.S. Army Garrison Camp Parks Reserve Training center in Dublin, Calif., to kick off the first construction phase of the largest Army Reserve Property Exchange Agreement in Department of Defense history.
  • BLOCK RELEASE OF WATER FROM SANTA ROSA RESERVOIR

    SANTA ROSA, N.M., -- The U.S. Army Corps of Engineers, Albuquerque District, will begin a routine release of water from Santa Rosa Lake and Dam starting Tuesday, March 12, 2013, at 8:00 a.m.
  • Ground Breaking Ceremony for Child Development Center at Holloman Air Force Base

    Maj. Gary Bonham, Deputy Commander, Albuquerque District, participated in the ground-breaking ceremony for a new Child Development Center at Holloman Air Force Base March 5, 2013.
  • Nashville District deputy commander promoted to lieutenant colonel

    Lt. Col. James A. DeLapp, U.S. Army Corps of Engineers Nashville District commander, officiated and promoted Maj. Patrick Dagon to lieutenant colonel here at a ceremony attended by his family and district employees at the headquarters building.
  • District Participates in New Border Patrol Station's Opening in Clint, Texas.

    Lt. Col. Gant, Commander, Albuquerque District, participated in the ribbon-cutting ceremony celebrating the opening of the new Border Patrol Station in Clint, Texas on February 22, 2013.
  • NR 13-008: Corps completes barrier wall at Wolf Creek Dam

    NASHVILLE, Tenn. (March 6, 2013) – The U.S. Army Corps of Engineers Nashville District poured concrete for the last pile of the barrier wall today, which completes the last and most critical component of the dam safety project required to mitigate seepage through the karst geology deep in the foundation of Wolf Creek Dam’s embankment. It is the last of 1,197 piles that are approximately four feet in diameter and extend up to 275 feet into bedrock below the foundation of the embankment. Altogether they interlock to form the barrier wall.
  • Nashville District completes Wolf Creek Dam barrier wall

    JAMESTOWN, Ky. (March 6, 2013) – Construction workers placed concrete for the last pile today, which completes the underground barrier wall and paves the way for raising the Lake Cumberland pool level. It is the last of 1,197 piles that are approximately four feet in diameter and extend 275 feet from near the top of the dam into bedrock below the foundation of the 4,000-foot long embankment of Wolf Creek Dam.
  • Dive team inspects Pickwick Lock ahead of dewatering

    COUNCE, Tenn. (March 5, 2013) – Divers and support personnel are doing a thorough underwater inspection of Pickwick Lock this week ahead of scheduled maintenance. The team is looking for signs of wear and tear and mapping its findings as the U.S. Army Corps of Engineers Nashville District prepares to empty water from the lock later this year.
  • Students shadow district personnel for a day of engineering

    NASHVILLE, Tenn. (March 1, 2013) – Two local high school sophomores shadowed a number of very experienced engineers today at the U.S. Army Corps of Engineers Nashville District to learn more about the jobs and educational requirements of the career field.