MEMPHIS, Tenn., May 10, 2012 – The Memphis District, U.S. Army Corps of Engineers today began removing the sand-filled HESCO bastions from the top of the levee in the upper crevasse at the Birds Point-New Madrid Floodway in preparation for this year’s construction season.