U.S. Army Corps of Engineers announces publication of 2026 nationwide permits
Jan. 08, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today the publication of the 2026 nationwide permits in the Federal Register. The 56 reissued and one new...
Read More
U.S. Army Corps of Engineers announces finalization of nationwide permits
Jan. 07, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today that it will reissue 56 existing nationwide permits and issue one new permit for work in wetlands and...
Read More
A Soldier and three other civilian men document events in an airfield tower.
USACE Black Start Exercise Brings Light to Readiness
Nov. 20, 2025 | 
News
Increased installation readiness is the goal of the Black Start Exercise Program, a joint U.S. Army Corps of Engineers-led initiative, to test and...
Read More
Army Executes POTUS Directive on Ambler Road Project
Oct. 23, 2025 | 
News Release
President Donald J. Trump has approved the appeal of the Alaska Industrial Development and Export Authority (AIDEA), directing the U.S. Army Corps of...
Read More
USACE introduces new Regulatory Request System module
Sep. 22, 2025 | 
News Release
The U.S. Army Corps of Engineers announced today the launch of a new “No Permit Required” module on its Regulatory Request System (RRS), an innovative...
Read More
Army Corps of Engineers begins implementing policy to increase America’s energy generation efficiency
Sep. 22, 2025 | 
News Release
Assistant Secretary of the Army for Civil Works Adam Telle today directed the U.S. Army Corps of Engineers to weigh whether energy projects that might...
Read More

HQ USACE News

  • February

    “Be brief, be brilliant and be gone” – Huntsville Center OE director takes the PRB helm

    “Wrangling complex projects is what Huntsville Center does best. And the Project Review Board is at the core of this success.” Once a month during the PRB, Huntsville Center program and project managers brief the command team on the progress, budget, challenges, good news and lessons learned of ongoing projects.
  • District Completes Critical Project 6 Months Ahead of Original Schedule

    A ribbon cutting ceremony held on February 20th marked the completion of a new $49.6 million steel and concrete pier project at the U.S. Navy base in Bahrain. The pier, built by the U.S. Army Corps of Engineers Middle East District, will enhance the Navy’s operational readiness in the region. Previously, the Navy had been using barges for much of the work on ships that can now be done while docked at the pier.
  • Making great strides in Power Governance in Afghanistan

    The collaborative efforts of the Senior Executive Power Governance group strives for creative and innovative solutions to meet the electrical needs of Afghanistan.
  • Civil Works Business Intelligence: Modernizing and Integrating U.S. Army Corps of Engineers Data Management and Analysis

    The collection, organization, accessibility, and interpretation of large sets of data are foundational to many of the major U.S. Army Corps of Engineers’ (USACE) decisions and actions across its many business lines.  These data sets include performance and traffic volumes at USACE locks and the nation’s ports, cargo statistics of barges (inland waterways and ports, both domestic and international), statistics regarding uses and visitor days at USACE recreational sites, flood loss damages prevented by USACE levees, amounts and value of hydropower generated at USACE hydroelectric power facilities, and other information across USACE’s Civil Works program.

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,742
Follow Us

News Releases

  • TAM Awards Job Order Contract for Kuwait

    The Middle East District awarded a job order contract for work in Kuwait.
  • TAM Awards Job Order Contract for Kuwait

    The Middle East District awarded a job order contract for work in Kuwait.
  • PUBLICATION NOTICE: Seamless Integration of Lidar-Derived Volumes and Geomorphic Features into the Sediment Budget Analysis System

    Abstract: This Regional Sediment Management Technical Note provides a workflow and case study documenting the process to integrate lidar-derived volume changes and changes quantified from geomorphic features into the Sediment Budget Analysis System. Sediment budgets provide an understanding of a region’s sediment sources, project needs, processes, data gaps, engineering actions, and ecological considerations. Elevation data from profiles or lidar, sediment characteristics, dredging and placement information, along with other coastal datasets, are used to understand sediment pathways and develop sediment budgets for a region. Workflows and tools have been updated or modified to integrate sediment budget tools, volume change tools, and remote sensing data for the creation of comprehensive regional sediment budgets. 
  • PUBLICATION NOTICE: Geochemical Fingerprinting of Sediment Sources Associated with Deposition in the Calcasieu Ship Channel

    Abstract: This Regional Sediment Management Technical Note (RSM-TN) demonstrates how geochemical fingerprinting techniques were used to distinguish probable sediment sources to the Calcasieu Ship Channel (CSC). These methods were applied to sediment samples collected from suspected source areas identified in past sediment budget studies. The techniques can be used by managers and stakeholders to make more informed decisions on best practices for managing sediment and mitigating sediment deposition within the channel.

Mississippi Valley Division