Results:
Tag: shoreline
Clear
  • Russellville Project Office Defers Shoreline Activity Requests until Oct. 1

    RUSSELLVILLE, Ark. – As a result of budget constraints the Army Corps of Engineers Russellville Project Office will defer all new requests for shoreline use until Oct. 1 allowing the Corps to shift its resources to address park visitor assistance during the summer recreation season.
  • Dredging and beach programs experience active year

    Florida’s shorelines saw a flurry of activity during 2012. The state experienced several storm systems that caused erosion impacts to a host of federal beach projects. In addition, a few beaches saw new sand placed on their shores as a result of U.S. Army Corps of Engineers’ dredging projects.
  • USACE Galveston District awards $3.4 million contract to dredge Brownsville Harbor Entrance Channel

    GALVESTON, Texas (Oct. 1, 2012) – The U.S. Army Corps of Engineers, Galveston District, awarded a contract in the amount $3,405,500 to Weeks Marine Inc. for maintenance dredging of the Brownsville Harbor Entrance Channel in Cameron County, Texas.
  • What is the Corps’ Beneficial Use Program?

    Annually, the U.S. Army Corps of Engineers Galveston District dredges approximately 30 to 40 million cubic yards of material as part of its mission of keeping America’s waterways navigable. The Corps is able to turn that into an added benefit by employing environmentally and economically responsible methods to uses dredged material to benefit local communities and improve eroded coastlines through marsh restoration, beach nourishment and other beneficial uses when possible.
  • Beach complete, infrastructure protected

    WALLOPS ISLAND, Va. – More than 3 million cubic yards of newly deposited sand is protecting the launch pads and critical infrastructure at NASA’s flight facility here.
  • Corps awards $1.9 million contract for Pistol Creek Lake Sediment Removal Project

    MARYVILLE, Tenn. (Oct. 6, 2011) – The U.S. Army Corps of Engineers Nashville District awarded a $1,956,888 contract Sept. 30 to Environmental, Safety & Health, Inc., of Knoxville, Tenn., for the Pistol Creek Lake Sediment Removal Project.
  • Center Hill Lake benefits from 'trashy' leadership teambuilding

    SILVER POINT, Tenn. (Oct. 1, 2011) – Leadership Development Program students from the U.S. Army Corps of Engineers Nashville District participated in a “trashy” teambuilding exercise today near Edgar Evins State Park on the shoreline of Center Hill Lake.
  • Nearly 600 volunteers ‘pitch in’ at 22nd Annual Lake Cumberland Clean-up

    SOMERSET, Ky. (Sept. 17, 2011) – Cooler temperatures welcomed volunteers to yet another successful National Public Lands Day event here along the shores of Lake Cumberland. The Friends of Lake Cumberland, in cooperation with the U.S. Army Corps of Engineers Nashville District, held the 22nd annual lake-wide cleanup, and the results were terrific.
  • Volunteers haul out 8,400 pounds of trash at Laurel Lake

    LONDON, Ky. (April 16, 2011) – A total of 270 volunteers worked from boat and shoreline today and hauled out 8,400 pounds of trash during the 14th annual Laurel Lake Clean-up. Some of the most unusual items retrieved included a water heater, a stove, and a 1979 Michigan license plate.