Results:
Tag: hydropower
Clear
  • North Overlook Picnic Area to Close

    The North Overlook Picnic Area is closed to public use effective Monday, September 22, 2014 until further notice. This closure also closes the trailhead access to the Volksweg Trail at this location, and the North Overlook Hiking Trail. The assembly of a large crane, future hydromill assembly and staging of equipment has necessitated the closure for construction on the Red Rock Hydropower Project.
  • Frye named Nashville District Employee of the Month for July 2014

    NASHVILLE, Tenn. (Sept. 8, 2014) - Ryan Frye, a hydropower maintenance engineer at the U.S. Army Corps of Engineers Nashville District’s Operations Division, is the Employee of the Month for July 2014.
  • Corps increases releases to lessen future flood risk

    The U.S. Army Corps of Engineers Missouri River Basin Water Management Division is increasing releases at the four lower dams on the Missouri River following heavy rains in August.
  • Missouri River Energy Services Officially Breaks Ground on Red Rock Hydroelectric Project

    PELLA, Iowa – The official groundbreaking of the Red Rock Hydroelectric Project (RRHP) took place Aug. 13 at Lake Red Rock near Pella, Iowa. The project is a retrofit of an existing Army Corps of Engineers dam on the Des Moines River that will produce 36 megawatts of power, with the capacity to generate up to 55 megawatts during peak seasons; enough to power about 18,000 homes. Missouri River Energy Services (MRES) is building the project, which is being financed by Western Minnesota Municipal Power Agency (WMMPA). RRHP is expected to be completed in 2018, at which point it will be the second-largest hydropower facility in Iowa.
  • T-15 will be down to one lane relating to construction of hydroelectric project

    One lane of T-15 that crosses over the Red Rock Dam will be closed so that workers can safely widen that section of road in order to add a turning lane. The widened road and turning lane will give workers access to the future intake structure for the Red Rock Hydroelectric Project that will be constructed at the dam. Signage indicating the one-lane closure will be placed at each end of the dam. Traffic will be limited to one lane each weekday between the hours of 7 a.m. and 5:30 p.m., beginning Tuesday, Aug. 19. It is hoped that the work will be completed by Friday, Aug. 28. Both lanes of the road will be open on Saturday and Sunday. The road will be completely closed later in the fall. Missouri River Energy Services (MRES), which is building the Red Rock Hydroelectric Project, will issue a notice prior to that closure. MRES also has developed a website at www.redrockhydroproject.com that will include up-to-date information about the project. For more information, contact MRES Director of Member and Public Relations Bill Radio, phone: 605-338-4042; e-mail: bill.radio@mrenergy.com.
  • Nashville District showcases its projects for world’s hydropower experts

    NASHVILLE, Tenn. (July 24, 2014) – During HydroVision International, the world’s largest hydro event, the U.S. Army Corps of Engineers Nashville District showcased its projects in Tennessee and Kentucky, which supported the professional development of conference attendees.
  • Chief of engineers highlights world’s largest hydro event

    NASHVILLE, Tenn. (July 24, 2014) – Lt. Gen. Thomas Bostick, U.S. Army Corps of Engineers commander and 53rd chief of engineers, energized more than 3,000 people from over 50 countries during the keynote session of the world’s largest hydro event at Music City Center July 22.
  • Rolling Over

    Earlier this year, the Charleston District’s St. Stephen Powerhouse hydropower units hit 999,999
  • Keisling named Nashville District Employee of the Month for May 2014

    NASHVILLE, Tenn. (June 27, 2014) – Amanda Keisling, office assistant at the U.S. Army Corps of Engineers Nashville District’s Dale Hollow Power Plant in Celina, Tenn., is the Employee of the Month for May 2014.
  • NR 14-018: Nashville District awards $47.25 million contract to rehabilitate three Center Hill Dam hydropower units

    NASHVILLE, Tenn. (June 26, 2014) – The U.S. Army Corps of Engineers Nashville District awarded a $47,257,431 contract yesterday to Voith Hydro, Inc., to rehabilitate three hydropower units at the Center Hill Dam Powerhouse in Lancaster, Tenn.