• Corps of Engineers to Test Spillway Gates at Lake Hartwell Dam March 13

    SAVANNAH, Ga. – Dam safety officials from the Savannah District, U.S Army Corps of Engineers, will test the spillway gates at one hydropower dam on the Savannah River tomorrow.
  • Osan Air Base cuts ribbon on $17 million chapel in South Korea

    CAMP HUMPHREYS, South Korea —Osan Air Base recently unveiled its $17 million chapel, heralding a new era of spiritual vitality, community connection, and enduring service. The ribbon-cutting ceremony on Feb. 29, led by U.S. Air Force Chief of Chaplains Maj. Gen. Randall Kitchens, brought together representatives from many units and the community to celebrate the new center of worship.
  • President’s Budget includes $500 million to support Green River fish passage, water supply, flood risk management

    The President’s Budget request for Fiscal Year 2025 includes $500 million for construction of a downstream fish passage facility at Howard A. Hanson Dam on the Green River.
  • President’s proposed Fiscal Year 2025 budget includes $280 million for Rough River Dam Safety Modification Project

    The President’s proposed budget for the Army’s Civil Works program for fiscal year 2025 was released today, March 11, 2024, and provides $280 million in federal funding to advance the Rough River Dam Safety Modification Project in Falls of Rough, Kentucky.
  • USACE announces virtual BBSEER Project Delivery Team Meeting March 15

    The U.S. Army Corps of Engineers Jacksonville District invites Project Delivery Team members, stakeholders, partners, and members of the public to attend a virtual Project Delivery Team (PDT) Meeting for the Biscayne Bay and Southeastern Everglades Ecosystem Restoration (BBSEER) Project study on Friday, March 15, 2024, from 9:00 a.m. to 12:00 p.m.
  • Serving the Northwest from afar

    Every day, Gabrielle Marucci sits down at her desk and logs into her computer, checking her email and meeting schedule. Her desk sits next to a window and, outside, one might expect to see scenery indicative of the Pacific Northwest. Marucci, after all, works for the Walla Walla District, located in the state of Washington.
  • Pittsburgh emergency team simulates its first scenario-driven exercise for local flood response

    As heavy rain hit the Pittsburgh region, waters flooded homes and carried debris across roadways that blocked emergency routes. Quickly, local resources became overwhelmed, and county leaders requested additional aid.
  • The Madness behind the Method: Showing the Human Side of Developing a World-Class Institution

    Abstract: The 2022–2023 Leadership Development Program 2 (LDP2) team from the Information Technology Laboratory (ITL) created this document to explore the human side of ITL’s history through the viewpoints of former influential figures at the lab. These individuals played a crucial role in elevating the lab to its current prominent position. The dynamic nature of the document allows continuous addition of such stories, providing future generations with insight into the unwavering commitment of the pioneers who established ITL’s esteemed legacy. Each nar-rative sheds light on different aspects of the lab, including its people, diversity, and excellence. The document serves as both a tribute to the lab’s achievements and a wellspring of inspiration for aspiring leaders, showcasing the profound impact of dedication and teamwork. By cele-brating these stories, we are able to learn from those who came before us and cultivate an enhanced vision for the future.
  • USACE to host in-person public meeting to review the Proctor Lake Master Plan and Shoreline Management Plan Revision

    The Fort Worth District, U.S. Army Corps of Engineers will host a public meeting on March 19, 2024 at the Comanche County Courtroom of the Comanche County Courthouse – 101 W. Central Ave., Comanche, Texas 76442 to provide information and receive public input on the Draft Proctor Lake Master Plan, Shoreline Management Plan, and Environmental Assessments. The meeting will begin with a brief presentation at 4:00 p.m. followed by an open house for the public to view the proposed land use and shoreline maps, ask questions, and provide comments about the project. If you are unable to attend the in-person meeting, documents will be provided for comment at the website listed below.
  • MKARNS Nav Notice No. SWL 24-27 Lock 10 Reopened

    The electrical issue at Dardanelle Lock (No. 10) NM 205.5 was repaired and the Lock is currently open to traffic.