News Stories

  • July

    LUCKEY FUSRAP SITE SAFELY TRANSPORTS 5,000th TRUCKLOAD OF MATERIAL FOR DISPOSAL – PHASE 1 EXCAVATION COMPLETE

    The 5,000th truck left the Luckey Formerly Utilized Sites Remedial Action Program Site today, loaded with material contaminated with beryllium, radium-226, thorium-230, uranium-234, uranium-238, and lead, which marks the substantial completion of Phase 1.
  • Contract awarded for Big Slough Channel Restoration project

    The Big Slough Channel Restoration project delivery team (PDT) members are feeling pretty good because they’ve reached the significant Contract Award milestone on their project. They awarded the contract to Polk & Associates, LLC.
  • Construction reaches new heights on Red River of the North project

    Construction is literally reaching new heights this summer on the Fargo-Moorhead Metropolitan Area Flood Risk Management Project.
  • Resource Efficiency Managers support modernization of defense industrial base

    At the forefront of this mission is the U.S. Army Engineering and Support Center, Huntsville’s Resource Efficiency Manager (REM) program, which brings the best minds in the free world together to introduce new technologies and processes that extract every possible unit of energy from the most fuel-efficient and resilient energy-system technologies available. REMs, often called the “energy boots on the ground,” provide vital expertise to develop site energy plans encompassing projects that achieve sustainable, renewable, and secure energy management.
  • 20-0364; Louisiana Department of Transportation

    The Louisiana Department of Transportation proposes to replace the Judge Perez Bridge with a new bridge over the Gulf Intracoastal Waterway, Algiers Canal West and East levee, vicinity of levee stations, 682+24 and 1083+29, respectively, at Belle Chasse, Louisiana, in Plaquemines Parish.
  • USACE campground sports new Splash Pad for fun and excitement

    JAMESTOWN, KY. (July 28, 2020) The word is out. One of the best way to beat the heat in the Lake Cumberland summer sun is to splash the day away in the refreshing sprinkles of a splash pad.
  • Omaha USACE employee recognized for leading team during COVID-19.

    An employee with the U.S. Army Corps of Engineers-Omaha District and native of Chicago, was recognized for his accomplishments during the COVID-19 pandemic.
  • Nursing and Engineering: A Surprisingly Unsurprising Pairing

    When I walked into the U.S. Army Corps of Engineers (USACE) Far East District (FED) building on my first day as a summer hire, I felt some uncertainty and confusion as to how I, a nursing major, could contribute to the district. I had never taken an engineering class, nor had I even visited a construction site before. The confusion extended into the district employees as well, as they looked at me and asked, “nursing and engineering? I can’t see how those two have any relation.”
  • USACE-Albuquerque District’s John Martin conduit project results in much needed maintenance and repairs

    The U.S. Army Corps of Engineers’ John Martin Dam received significant maintenance and minor repairs in a recently completed conduit project.
  • Rivers Project Office – Timber Sale

    The Rivers Project Office in West Alton, Mo., is conducting its first timber sale and harvest in order to promote the establishment of early successional floodplain forest along the Mississippi River. The objective of this project is to improve forest health and enhance habitat for a variety of wildlife. Bids are now open to the public.

News Releases

Mississippi Valley Division

Institute for Water Resources

South Pacific Division

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,811
Follow Us