U.S. Army Corps of Engineers announces publication of 2026 nationwide permits
Jan. 08, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today the publication of the 2026 nationwide permits in the Federal Register. The 56 reissued and one new...
Read More
U.S. Army Corps of Engineers announces finalization of nationwide permits
Jan. 07, 2026 | 
News Release
The U.S. Army Corps of Engineers announced today that it will reissue 56 existing nationwide permits and issue one new permit for work in wetlands and...
Read More
A Soldier and three other civilian men document events in an airfield tower.
USACE Black Start Exercise Brings Light to Readiness
Nov. 20, 2025 | 
News
Increased installation readiness is the goal of the Black Start Exercise Program, a joint U.S. Army Corps of Engineers-led initiative, to test and...
Read More
Army Executes POTUS Directive on Ambler Road Project
Oct. 23, 2025 | 
News Release
President Donald J. Trump has approved the appeal of the Alaska Industrial Development and Export Authority (AIDEA), directing the U.S. Army Corps of...
Read More
USACE introduces new Regulatory Request System module
Sep. 22, 2025 | 
News Release
The U.S. Army Corps of Engineers announced today the launch of a new “No Permit Required” module on its Regulatory Request System (RRS), an innovative...
Read More
Army Corps of Engineers begins implementing policy to increase America’s energy generation efficiency
Sep. 22, 2025 | 
News Release
Assistant Secretary of the Army for Civil Works Adam Telle today directed the U.S. Army Corps of Engineers to weigh whether energy projects that might...
Read More

HQ USACE News

Results:
Tag: Lake Okeechobee
Clear
  • June

    Col. Kelly on Lake Okeechobee: balancing project purposes

    One of the challenges we face at the Jacksonville District of the U.S. Army Corps of Engineers is balancing all of the purposes of managing Lake Okeechobee given to us by Congress – flood control, water supply, navigation, recreation, and preservation of fish and wildlife resources. As we enter rainy season, we will keep focusing on balancing the purposes of lake water management and setting favorable conditions.
  • March

    Corps defends against invasive lizards

    Cold-stunned green iguanas, dubbed “chicken of the trees,” made national headlines as they fell from the trees in south Florida during a recent cold snap. News stories and social media helped to raise public awareness about the damage that can be wrought by the large invasive lizards, which can reach more than five feet and twenty pounds. According to the media reports, these invaders weren’t just munching their way through the succulent plants of south Florida’s gardens, they also wreaked havoc on private properties and important public infrastructure, shorting out power lines and burrowing under structures, causing some of them to collapse. In one city, they reportedly contributed enough damage to a water control structure that the repair bill reached $1.8 million. Construction, rehabilitation and maintenance of critical infrastructure are key missions for the U.S. Army Corps of Engineers, which is responsible for the 143-mile Herbert Hoover Dike around Lake Okeechobee, five navigation locks and dams and recreation areas along the 154-mile long Okeechobee Waterway, and Everglades restoration. Maintaining the integrity of these structures and protecting them from damage is integral to the success of these missions.
  • USACE continues work on e Lake Okeechobee Regulation Schedule deviation

    After he took charge of the U.S. Army Corps of Engineers Jacksonville District in 2018, Col. Andrew Kelly charged his team to look for tools that would offer different options for the management of water in Lake Okeechobee during times when harmful algal blooms (HABs) were present. Significant HAB events affected Lake Okeechobee and the coastal estuaries in 2016 and 2018. Jacksonville District engineers and biologists reviewed the Lake Okeechobee Regulation Schedule (LORS) and looked for potential tools to adjust operations in anticipation of possible future HAB events. Last summer, Jacksonville District rolled out a proposed deviation to LORS that would provide greater flexibility in the management of water with the goal of reducing the health risk to the public associated with HABs.
  • December

    USACE updates dry-season approach for Lake Okeechobee

    The water management team at the U.S. Army Corps of Engineers is now focused on the year ahead and the challenges that we face. Unlike last year, our focus this year will be on retaining water during the dry season.

News/News Release Search

@USACEHQ

Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
Twitter
Logo
X
46,742
Follow Us

News Releases

Results:
Tag: Lake Okeechobee
Clear
  • Corps announces approval of a planned deviation from Lake O Regulation Schedule to reduce risk from Harmful Algal Blooms

    The U.S. Army Corps of Engineers Jacksonville District, announces the approval of a planned deviation from the water control plan for Lake Okeechobee and the Everglades Agricultural Area, also known as the Lake Okeechobee Regulation Schedule (LORS 2008), in order to reduce risk from Harmful Algal Blooms.
  • Army Corps of Engineers announces Lake Okeechobee Releases

    The U.S. Army Corps of Engineers (USACE) Jacksonville District will start releasing water from Lake Okeechobee today after heavy inflows from the north and rains across the region caused the lake to reach 16.21 feet, a 1.33 foot rise in the past 30 days with six weeks left in hurricane season.
  • Corps announces public comment and webinar on planned deviation from Lake O Regulation Schedule to reduce risk from Harmful Algal Blooms

    The U.S. Army Corps of Engineers Jacksonville District, announces public comment on the Draft Revised Supplemental Environmental Assessment (EA) and Proposed Finding of No Significant Impact (FONSI) for the planned deviation from the water control plan for Lake Okeechobee and the Everglades Agricultural Area, also known as the Lake Okeechobee Regulation Schedule (LORS 2008) in order to reduce risk from Harmful Algal Blooms. A webinar to provide information regarding the proposed planned deviation is planned for 1 p.m. on July 21. Public comments are due July 30.
  • LOSOM PDT Meeting Scheduled for June 25; Pre-registration required

    The U.S. Army Corps of Engineers, Jacksonville District, announces the next Project Delivery Team (PDT) meeting for the Lake Okeechobee System Operating Manual (LOSOM), to be held June 25 from 1 p.m. to 4:30 p.m. Due to continuing COVID-19 restrictions on public meetings, this meeting will be held online only. NOTE: Pre-registration required.

Mississippi Valley Division